Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Mobile, Alabama. Contact the soliciting agency for additional information.
Mobile County wants to provide any business desiring to offer a bid on any service, supplies or equipment an opportunity to secure bid information and requirements. Therefore, we plan to make county bid specifications accessible online. Please see below for bid packages. For more information: Mobile County Purchasing Agent MCPurchasing@mobilecountyal.gov For information about Engineering projects, please contact the Engineering Department at 251-574-8595. Mobile County is not responsible for bids delayed by mail. All bidders shall furnish a five percent (5%) bid bond on any contract exceeding $30,000.00: provided that bonding is available for services, equipment or materials. Bid bond will be accepted in the form of a certified check, cashier's check, or postal money order, etc. he services required include weeding, cultivating, trimming, pruning, mowing and edging. Contractor will furnish all equipment, materials and labor. Contact Jim Stokley at 251-574-4444 if you have any questions. SCOPE OF WORK: A. Contractor will bring facility up to the standards established by the scope of work with the first two month (60) day of the first contract year. When, to the satisfaction of Mobile County Commission, that this facility is to the standard, the contractor will be eligible for payment of the one-time initial fee. B. Bi-weekly mowing during the months of March through September to be done during the Ist and the 3rd weeks of the month. Monthly mowing during the months of October through February for the entire complex to be done during the Ist week of the month. Work is to be done before 8:00 a.m. and completed within 24 hours. Inspect and remove new or dead growth so walkways, sidewalks are kept clean and look well cared for. Trimming during the growing season shall occur as needed to ensure the following standards are met: 1. Remove dead, damaged and diseased portions of plants. 2. Prune trees and shrubs. 3. Trees,shrubsandgroundcovermustbekeptofffirehydrants,signs,fences,walls,sitting C. Lawns, bedded areas, fence lines, asphalt and concrete pads shall be kept grass and weed free. Contractor shall be responsible for removing weeds and grass in passenger loading and parking areas. D. Sweep or use blower to clean all sidewalks and/or concrete areas affected by work. All debris shall be removed from the site. E. Pick up and remove all leaves and debris in landscape areas, passenger loading and parking lots starting in autumn. F. Edging around lawn perimeters, sidewalks and bedded areas shall be done with each mowing. G. In the event the contract fails to accomplish any task under this scope of work, Mobile County will provide reasonable notice to take corrective action. If the Contractor does not perform the service (corrective action), Mobile County may, at its option, cause the non-performed task to be accomplished through another source and deduct the cost of such from the amount normally due the contractor for that monthly period. It will be mandatory for the contractor to send an email on the day of each service to Jim Stokley (jim.stokley@mobilecountyal.gov) so that we may inspect before payment will be rendered at invoice.
Post-Bid
Municipal
Public - County
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2024
October 1, 2024
1150 Government St, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Aug 07 2024
Mobile, AL
Bid Date: Sep 24 2024
Mobile, AL
Bid Date: Jul 19 2024
Mobile, AL
Bid Date: Jul 12 2024
Mobile, AL
Bid Date: Jul 10 2024
Mobile, AL
Bid Date: Aug 14 2024
Mobile, AL
Bid Date: Jul 25 2024
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Jul 24 2024
Mobile, AL
Bid Date: Jul 24 2024
Mobile, AL
Bid Date: Jul 09 2024
Mobile, AL
Bid Date: Jun 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.