BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Antlers, Oklahoma. Completed plans call for site work for a transportation facility.

Construct Fuel Farm. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. Upon receipt of an acceptable bid, the contract will be awarded within one hundred twenty (120) days after opening of bids and the written contract executed within ten (10) days thereafter. All bidders shall make good faith effort, as defined in Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract ten percent (10.00%) of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). A cashier's check, a certified check, a surety bond or an irrevocable letter of credit in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. The City of Antlers reserves the right to reject any and all bids and to waive any or all bids and to waive any and all informalities. Document Note: Bids shall be made in accordance with the Bidding Documents, which include, but are not limited to the Information for Bidders, Plans, Specifications, Bidder's Proposal, and Contract Documents on file and available for examination at the Office of the City Clerk in the Municipal Building, 100 SE Second Street, Antlers, Oklahoma, and are made a part of this notice as though fully set forth herein. Pre bid meeting description: No plans, specifications or bid documents will be issued after the Pre-Bid Conference, unless you have signed the pre-bid attendance sheet. You must be a plan holder to bid. All bidders must visit and inspect the construction site and be familiar with the physical characteristics and conditions at the construction site. The work to be performed under this contract shall commence on the first working day after the date of written “Notice to Proceed” of the Owner is issued and shall be fully completed within 40 working days from the notice to proceed for the PROJECT.

Award

Transportation Terminals

$474,648.00

Public - City

Site Work

11

8

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
19
Bidding Soon
721
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

img_map_placeholder

To Be Determined, Antlers, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.