Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2024 at 8:00 PM

Updated September 17, 2024

Site work for a transportation facility in Antlers, Oklahoma. Completed plans call for site work for a transportation facility.

Construct Fuel Farm. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. Upon receipt of an acceptable bid, the contract will be awarded within one hundred twenty (120) days after opening of bids and the written contract executed within ten (10) days thereafter. All bidders shall make good faith effort, as defined in Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract ten percent (10.00%) of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). A cashier's check, a certified check, a surety bond or an irrevocable letter of credit in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. The City of Antlers reserves the right to reject any and all bids and to waive any or all bids and to waive any and all informalities. Document Note: Bids shall be made in accordance with the Bidding Documents, which include, but are not limited to the Information for Bidders, Plans, Specifications, Bidder's Proposal, and Contract Documents on file and available for examination at the Office of the City Clerk in the Municipal Building, 100 SE Second Street, Antlers, Oklahoma, and are made a part of this notice as though fully set forth herein. Pre bid meeting description: No plans, specifications or bid documents will be issued after the Pre-Bid Conference, unless you have signed the pre-bid attendance sheet. You must be a plan holder to bid. All bidders must visit and inspect the construction site and be familiar with the physical characteristics and conditions at the construction site. The work to be performed under this contract shall commence on the first working day after the date of written “Notice to Proceed” of the Owner is issued and shall be fully completed within 40 working days from the notice to proceed for the PROJECT.

Award

Transportation Terminals

$474,648.00

Public - City

Site Work

11

8

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
48
Bidding Soon
969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

Project location map

To Be Determined, Antlers, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed