Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Hastings, Minnesota. Contact the soliciting agency for additional information.
Dakota County is seeking proposals for commissioning services for the replacement of two existing steam boilers, steam piping, and steam coils with hot water boilers, hot water piping and pumps, and hot water coils and also the replacement of two chillers for the Law Enforcement Center in Hastings, MN. This work will include the complete replacement of all the thirteen air handlers. Anticipated services include reviews of MEP systems during design, commissioning of MEP systems during construction, construction acceptance and occupancy. The Commissioning Agent shall validate that the MEP systems are calibrated to meet the design intent as represented in the contract documents and the County's Design Standards. The scope of work for this project will include time during design, construction, construction acceptance. Project Description: The County has contracted with CMTA to convert the existing steam heating system to a hot water heating system, and replace the existing steam boilers with dual fuel (gas/oil) N+1 redundant high efficiency condensing boilers. There is new hot water piping to all existing air handling units. Existing heat exchangers and pump sets will be removed, and the existing hot water piping would be connected to new hot water piping from the new boiler system. The existing chillers and chilled water pumps will be removed and replaced with a new N+1 redundant constant primary, variable pumping chilled water central plant. The existing cooling towers and condenser water pumps will be reused as they are in fair condition and of sufficient capacity for a new chiller system. Chilled water piping will be reused throughout the facility. All air handling units will be replaced. New air handling units are assumed to be the same supply airflow capacity as the existing ones. All new units will be hot water heated, chilled water air-conditioned, and variable volume air flow. The new units will also receive all new DDC controls and where practical, energy recovery. Reference Attachment P to further clarify the work. Project Construction Budget: The construction budget amount is currently estimated to be $6,300,000. Question Deadline 07/15/2024 at 10:00 AM CT All questions regarding this Request for Proposal should be directed to: Joe Lexa, Project Manager Capital Projects Management Dakota County Administration Center 1590 West Highway 55, Hastings, MN 55033 Phone: 651-438-4566 E-mail: Joe.Lexa@co.dakota.mn.us Construction Start March, 2025 Construction Substantial Completion November, 2026 Licenses. At its own expense, Contractor shall procure and maintain all licenses, certifications, registrations, permits, or other rights required to perform the Services under this Contract. Contractor shall furnish copies of the above to the County upon request. Contractor shall provide Notice to the County of any changes in the above within 5 calendar days of the change. Any violation of this section is a material breach of this Contract. No Notice of Default is required to terminate under this section.
Post-Bid
Fire / Police
$6,300,000.00
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2024
March 3, 2025
1580 Hwy 55, Hastings, MN
Related To This Project
Hastings, MN
Bid Date: Aug 06 2024
Hastings, MN
Bid Date: Jul 26 2024
Hastings, MN
Bid Date: Aug 27 2024
Hastings, MN
Bid Date: Aug 08 2024
Hastings, MN
--
Hastings, MN
Bid Date: Dec 06 2024
Hastings, MN
Bid Date: Aug 30 2024
Hastings, MN
Bid Date: Sep 05 2024
Hastings, MN
--
Hastings, MN
--
Hastings, MN
--
Hastings, MN
Bid Date: Jun 25 2024
Hastings, MN
Bid Date: Jun 17 2024
Hastings, MN
Bid Date: Jun 17 2024
Hastings, MN
Bid Date: Jun 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.