Site work for a road / highway in Montreal, Quebec. Completed plans call for site work for a road / highway.

The works which are the subject of this contract includes the reconstruction of the timber crib walls "East" of the former island of the Côte St-Paul footbridge as indicated in the Tender Form as well as on the plans. Rehabilitation works may include, but are not limited to, one or more of the following activities: 1. Replacement of concrete crowning (retaining) walls; 2. Replacement of the existing timber crib walls (retaining) on Reach No 4, east and west side of Côte-St-Paul footbridge. 3. Perform all georeferenced detailed survey (NAD83 (CSRS) surveys of existing walls to be repaired or replaced, natural terrain surveys, bollards, rungs, guardrails, excavation bottoms and cuts for validation as well as all the items mentioned in the Bid Form; This survey must be vertically referenced for the elevations of the points by CGVD2013 or CGVD28. 4. Perform a bathymetry of the bottom of the Canal with a grid of one (1) metre (1 m by 1 m) along the entire length of the work areas (reach No 4) and across the first 15 meters wide of the Canal. Provide for a minimum length of 70 meters. Provide specialized equipment required and / or divers if needed; 5. Provision of laboratory services for quality control and signalers during the duration of the work. 6. Preparation of the registers indicated in the specifications; 7. Any other repair details, interventions or precisions shown in the plans issued under this contract; To assist with bonding and insurance requirements, this project is estimated at a value between $1,000,001 > $5,000,000, Taxes extra. Work on this phase is to be fully completed in twenty-two (22) calendar weeks, including the two (2) weeks of construction vacation, starting on the second Monday in October 2024. Reclamation of earthworks (soil and sod only) may be carried out during the first two (2) weeks of May 2025, and must be completed by May 16, 2025. Documents can be obtained at: https://canadabuys.canada.ca/ *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$5,000,000.00

Public - Federal

Site Work

23

19

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
104
Bidding Soon
1,741
All Active Projects
720
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 14, 2024

img_map_placeholder

Multiple Locations, Montreal, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.