BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Gretna, Louisiana. Contact the soliciting agency for additional information.

The Jefferson Parish Department of Public Works - Parkways (Parkways Department) is soliciting qualified Contractors for a two (2) year contract for tree work (tree removal, stump removal, trimming & pruning, hauling tree debris, termite & insect treatment, and fertilization) to be performed throughout unincorporated Jefferson Parish. A Louisiana State Contractor's License is required in the following classification: o Specialty: Landscaping, Grading and Beautification A LA State Contractor's License will be required in accordance with LSA R.S. 37-2150 et. seq. and such license number will be shown on the outside of the bid electronic envelope. Failure to comply will cause the bid to be rejected. When submitting the bid electronically, the license number must be entered in the appropriate field in the electronic procurement system. Failure to comply will cause the bid to be rejected. A bid bond in the amount of 5% of bid response is due with the bid submission. An Electronic Bid Bond must be submitted with this bid, through one of the respective clearing houses at online. A performance bond in the amount of 100% of the contract is required at the signing of the formal contract. A payment bond in the amount of 100% of the contract is required at the signing of the formal contract. The Parkways Department shall have the ability to charge the Contractor for Liquidated Damages for unsatisfactory work. Liquidated Damages may be assessed as outlined below: Unauthorized Tree Removal Liquidated Damages may be assessed for any unauthorized tree removals. Damage amounts will correspond to the size of the removed tree(s): 1" - 6" Dia. = $1,000.00 7" - 12" Dia. = $2,000.00 13" - 18" Dia. = $3,000.00 19" - 24" Dia. = $4,000.00 25" and Larger Dia. = $5,000.00 Note: Diameter measurement shall be taken from the stump of the removed tree(s). Scheduling of work is an important part of this contract. Liquidated Damages of two hundred fifty dollars ($250.00) per calendar day may be assessed for any unapproved schedule changes and/or missed assignments. Agreed upon weather delays shall not warrant Liquidated Damages.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
97
Bidding Soon
1,063
All Active Projects
522
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 6, 2024

September 6, 2024

September 7, 2026

img_map_placeholder

Multiple Locations, Gretna, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.