EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2024 at 8:00 PM

Updated August 14, 2024

Site work and paving for a civil project in Midway, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

2024 Road and Utility Improvements. Description: PROJECT DESCRIPTION: Bid Alternate A - Burgi Hill Park Project Includes: 1. Replace approximately 938 lineal feet of existing sewer line with new 10" PVC SDR-35 Sewer Line and 7 existing manholes. 2. Install approximately 728 lineal feet of new 10" PVC SDR-35 sewer line, replacement of 8 existing manholes, and installation of 5 new manholes. 3. Connect to existing sewer line. 4. Replace existing asphalt trail adjacent to sewer line alignment. Bid Alternate B - Farm Road Project Includes: 5. Replace approximately 1,138 lineal feet of existing waterline with 8" PVC C900 DR-18 waterline. 6. Install approximately 12 lineal feet of 6" PVC C900 DR-18 waterline. 7. Replace approximately 1,128 lineal feet of 8" sewer line with new 8" SDR-35 sewer line. 8. Replace 13 sewer service lines, to extend 10' beyond edge of pavement. 9. Replace 13 water service lines, including meter and yoke. 10. Replace 3 existing manholes. 11. Replacement of 2 existing fire hydrants, and installation of 1 new fire hydrant at the end of Farm Road. 12. Connect to existing water and sewer lines. 13. Replace approximately 37,307 square feet of asphalt road. Bid Alternate C - 200 East Project Includes: 14. Install approximately 366 lineal feet of 8" PVC C900 DR-18 waterline. 15. Install approximately 10 lineal feet of 6" PVC C900 DR-18 waterline. 16. Install 3 water service lines per plans, including meter and yoke. 17. Install 1 fire hydrant at end of waterline. 18. Install 302 lineal feet of 8" PVC SDR-35 sewer line. 19. Install 1 sewer manhole. 20. Connect to existing sewer and water lines. Site Address: 75 North 100 West DOCUMENTS REQUIRED AT BID OPENING: 1. Bid forms provided. (Sections 00200, 00300, and 00355) 2. Cashier or Certified check or bid bond made payable to Midway City Corporation in an amount equal to at least five percent (5%) of the total amount of the bid. Bid bonds must be underwritten by a Surety Company approved by the U.S. Department of the Treasury. (Circular 570, latest edition). Bids may not be withdrawn after the time fixed for submitting them. The Owner reserves the right to waive irregularities in the bids and reject any and all bids.

Bid Results

Water / Sewer

$1,300,000.00

Public - City

Paving, Site Work

34

9

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring, Terrazzo Flooring, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
16
Bidding Soon
607
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 2, 2024

img_map_placeholder

75 N 100 W, Midway, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.