BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sandy, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Background: The USDA Forest Service and the Mount Hood National Forest are soliciting the Rivbulio Fire Recovery IRSC which shall be awarded under the following Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. NAICS: 115310: Support Services for Forestry, Size Standard: $34M Fuels Management Services. Multiple awards may be made to this solicitation. Project areas have been separated and the schedule is designed to allow for individual awards to be made that will complete all requirements within a given project area. Project Location: The Rivbulio Fire Recovery IRSC project is located approximately 16 miles (Memaloose) to 56 miles (Olallie) southeast of Estacada, Oregon. Access to the project area is via State Highway 224 (heading southeast from Estacada) and Forest Road 46; using Forest Service Roads (FSRs) within the Memaloose/Hillockburn, Fish Creek, Bull Complex, and Olallie areas south of State Hwy 224. The total project area is within the Clackamas Ranger District of the Mt. Hood National Forest. The proposed project area lies generally within the following township and ranges and FSRs: Memaloose/Hillockburn Area - T04S, R05E and T05S, R05E; FSR 4500, 4500220, 4500240, 4510, 4520, 4510021 Fish Creek Area - T05S, R05E and T05S, R06E; FSR 5400, 5410, 5411, 5412, 5411210 Bill Complex Area - T08S, R07E; FSR 6350, 6355, 4671, 4672 Olallie Area - T08S, R08E and T09S, R08E; FSR 4220 Willamette Principal Meridian, Clackamas County, Oregon. Planned Period of Performance: All work is tentatively anticipated to have the following final completion dates: December 31, 2027. Description of Work: The Rivbulio IRSC will implement roadside hazard tree abatement treatments, road repair and reconstruction work in response to disaster declaration FEMA-4562-DR. The objective is to reduce roadside fuel loading and to provide safe access for the public road users. Activities to achieve these end results include performing essential maintenance and reconstruction of roads, cutting of fire killed/damaged roadside trees, removal of cut timber, managing roadside slash and fuel accumulation which will help with site preparation for future reforestation efforts along roads and reduce future fire risk. This contract will secure services to perform necessary hazard tree abatement work along Forest system roads that will include the removal of Forest products that meet utilization standards and associated slash work, Additional services to be procured include standard road maintenance activities, culvert cleaning and replacement, guardrail replacement, and armoring of identified system roads to facilitate the removal of Forest products. The anticipated operational seasons for road work activities is June 1 - October 15 annually. Ground based hazard tree work is anticipated to be permitted year-round and must comply with required protections for wet season operations and IFPL. The end result is a road system that has no standing fire killed/damaged trees within striking distance of the road (including the slide and roll area). This will be done by accomplishing the following: Identifying and cutting standing fire killed/damaged trees. Removing cut trees where applicable. Piling, scattering, chipping, incinerating and/or removing operationally generated slash and fuels. Maintaining roads within the contract area. Reconstructing roads within the contract area. Estimated Timber Volume and acres is as follows: The entire project area is estimated at 2,314 acres of roadside hazard tree abatement with associated slash treatments in removal areas. Forest Product volume estimates for the entire project are 48,901 CCF of biomass/cull material. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed. Interested Contractors are urged to examine the individual contract areas and make their own estimates. The Hillockburn-Memaloose project area is estimated at 866 acres and 25,394 CCF of biomass/cull. The Fish Creek project area is estimated at 627 acres and 15,872 CCF of biomass/cull. The Bull Complex project area is estimated at 383 acres and 7,953 CCF of biomass/cull. The Olallie Lake project area is estimated at 438 acres and 5,682 CCF of biomass/cull. Solicitation Site Visit Date and Time: The Mount Hood National Forest will hold a site visit for prospective contractors to discuss the end results of the project, and to facilitate dialogue on contractual requirements that are anticipated in the contract, and any discuss or consider any operational limitations foreseen by attendees. The site visit will be held on August 6th, 2024, at 10:00 a.m. PT with a meeting location at the Fish Creek Campground, at the junction of OR 224 and Forest Service Road 54. Included Attachments: 0. Rivbulio Fire Recovery IRSC Solicitation Letter 1. 12363N24R4018 Rivbulio FR IRSC 2. Rivbulio FR IRSC Appendix A 3. Rivbulio FR IRSC Appendix B 4a. Hillockburn/Memaloose Appendix C 4b. Fish Creek Appendix C 4c. Bull Complex Appendix C 4d. Olallie Appendix C 5a. Hillockburn/Memaloose Appendix D Plans 5b. Hillockburn/Memaloose Appendix D Supplemental Specifications 5c. Fish Creek Appendix D Plans 5d. Fisk Creek Appendix D Supplemental Specifications 5e. Bull Complex Appendix D Plans 5f. Bull Complex Appendix D Supplemental Specifications 5g. Olallie Appendix D Plans 5h. Olallie Appendix D Supplemental Specifications 6a. Hillockburn-Memaloose CAM* 6b. Fish Creek CAM* 6c. Bull Complex CAM* 6d. Olallie CAM* 6e. Olallie Slash CAM* 6f. Rivbulio IRSC Invasives Map Book 6g. Rivbulio IRSC Invasives North Tiles 6h. Rivbulio IRSC Invasives South Tiles 7. Sediment Trap Examples 8.Rivbulio FR IRSC SF-24-23a 9. Service Contract Act Wage Determination #1977-0079, Revision #76 dated 07/22/2024 10. Davis-Bacon Wage Determination #OR20240001 Modification #8 dated 06/28/2024 *Attachments marked with an asterisk contain errors. References to protections on all Contract Area Maps (CAMs) are incorrect and reference the draft solicitation that was shared. Corrected CAMs will be uploaded and replace the current CAMs after the site visit.

Award

Roads / Highways

$18,718,662.00

Public - Federal

Paving, Site Work

137

23

4

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
57
Bidding Soon
1,053
All Active Projects
378
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2024

October 9, 2024

img_map_placeholder

Multiple Locations, Sandy, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.