BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Rome, Georgia. Completed plans call for the construction of a playground / park / athletic field; for site work for a sidewalk / parking lot; playground / park / athletic field; for paving for a sidewalk / parking lot; and water / sewer project.

As of September 12, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. This project includes complete park development. This will include demo/disposal of existing concrete, sewer line replacement, (550 feet of 6 inch line), grading, water quality system, pavilion, cantilevered shade structure with bleachers, water feature, a playground (2-5 years old and a playground for 5-12 years old , picnic area, previous walking trail, landscape, sod, and irrigation. Civil plans and site design attached. NOTE: Entire area is in a food plain. A certifed check or bank draft, payable to the Northwest Georgia Housing Authority, U.S. Government Bonds, or a satisfactory bid bond executed by the bidder and acceptable sureties in an amount equal to fve (5%) of the bid shall be submitted with each bid. The successful bidder will be required to furnish and pay for a satisfactory performance and payment bond or bonds. All bonds must be signed by a Georgia Resident for Resident Agent. NWGHA reserves the right to reject any or all bids or to waive any informality in the bidding. Bids may be held by NWGHA for a period of not to exceed thirty (30) days from the date of the opening of the bids for the purpose for reviewing them and investigating the qualifcations of bidders, prior to awarding the contract. 1. Contractor to provide all labor, equipment, insurance, permits, materials (including backfill), and services necessary to complete the project as follows: Demo and disposal of existing concrete. Sewer line replacement (550 feet of 6 inch line). Allowance $23,000 Grading. Water quality system. Pavilion. Cantilevered shade structure with bleachers. Water feature. Allowance $150,000 A playground for 2-5 year old. Allowance $100,000 A playground for 5-12 years old. Allowance $100,000 Picnic area. Pervious walking trail. Landscape. Allowance $76,000 Irrigation. Allowance $100,000 Site Furnishings - Allowance $35,000 Signage - Allowance $20,000

Bid Results

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

New Construction, Paving, Site Work

13

8

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
73
Bidding Soon
1,390
All Active Projects
578
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 19, 2024

img_map_placeholder

60 Brookwood Ave NW, Rome, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.