BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work and paving for a road / highway in Milwaukee, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

IH 43 north south freeway Becher I/c Const/reconstruct Backbone Net miles : 0.000 County : Milwaukee Estimate Anticipated Funding $5,000,000 - $5,999,999 As of April 29, 2025, the project is in Conceptual status. Anticipated letting date is 02/10/2026. WisDOT - IH 43 North South Freeway *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. __________________________________________________________________________________________________________ https://www.jsonline.com/story/communities/north/2024/11/12/i-43-project-reconstruction-of-southbound-lanes-set-to-begin-nov-14/76203973007/ Stretch of southbound I-43 to close Nov. 14 as the freeway's construction continues Portrait of Claudia LevensClaudia Levens Construction continues along Interstate 43 where Wisconsin's Department of Transportation is modernizing the freeway that is over 50 years old and has exceeded its design life. Beginning on Thursday, Nov. 14, crews will be reconstructing I-43's southbound lanes, and traffic between Glen Oaks Lane and just south of Donges Bay Road will be shifted east onto the northbound lanes, according to a Nov. 8 Facebook post by the WisDOT's I-43 North-South Project account. Additionally, the southbound ramps at Mequon Road will close through spring 2025. WisDOT encouraged drivers to detour around it, using the southbound exit ramp to Highland Road, Port Washington Road, and the County Line Road entrance ramp to I-43 southbound. Starting on Nov. 14, traffic between Glen Oaks Lane and just south of Donges Bay Road will be shifted east onto the northbound lanes, WisDOT said. The 14-mile stretch where the entire reconstruction project is taking place begins at Silver Spring Drive in Milwaukee County and extends north to Highway 60 in Ozaukee County. In total, the project will expand I-43 from four to six lanes, reconstruct five interchanges along the corridor, add a new interchange at Highland Road and replace the Union Pacific railroad bridge over I-43 in Glendale. It will also expand a section of Port Washington Road in Glendale from two to four lanes. The I-43 freeway is among the busiest routes in Wisconsin and is a critical interstate link between southeast Wisconsin and the entire state, according to the Wisconsin Department of Transportation website. ______________________________________________________ IH 43 north south freeway Becher I/c Const/reconstruct Backbone Net miles : 0.000 County : Milwaukee Estimate Anticipated Funding $5,000,000 - $5,999,999 As of July 05, 2024, the project is in Conceptual status. Anticipated letting date is 02/10/2026. WisDOT - IH 43 North South Freeway *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$5,999,999.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
197
Bidding Soon
1,874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2026

Project location map

I-43, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.