Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Sparks, Nevada. Completed plans call for site work for a water / sewer project.
Amendment 0001: This amendment serves to add the following information to Section C.3 SITE INFORMATION AND LIMITATIONS, located on page ten of the solicitation. This new paragraph will follow paragraph 5 and will be labeled as 6.: C.3 A. 6. The access road is a high clearance road accessible by ATV or UTV. The road is often saturated from the overflow from the water tank. All ruts caused or exacerbated by vehicular access shall be repaired and drainage shall be directed off the road. Hand shoveling ruts and creating waterbars would be acceptable. All other information, terms and conditions remain the same. The offer due date and time will remain the same. --------------------------------------------------------------------------------------------------------------------- SCOPE OF CONTRACT This project includes replacement of two existing float valves in the water storage tank for the Bridgeport Forest Service compound. This also includes calibration and the electrical work needed to operate the well successfully on a summer system and winter system. Disinfecting the tank will also be included in this project. The existing water tank is a 10,000 gallon stainless steel tank with 2 manholes. There are 2 float valves in a single valve box between the manholes. One valve controls a higher water level during the summer when more people live at the compound. And the other controls a lower water level in winter so the lower use does not result in stagnant water in the tank. The existing float valves have become disconnected and/ or twisted. A new radio communication system was installed in 2023 relaying water level signals to the well controls mounted on a house at the compound. Currently, the float valves do not operate correctly, and the well must be manually turned on and off to fill the water tank. It has been verified that the new radio controls do send a signal to the well but the signal from the floats to the radio controls is not there. This project is to install two float controls (summer/ winter) one in the manhole without the ladder and one in the existing valve box penetration. This layout could be changed with a proposal that would eliminate the chance the two floats would become tangled. The new float valves need to be wired so that they communicate with the new radio controls and successfully control the operation of the well. The old float valves will be removed and the entry into the water tank shall remain water and airtight. The design of this installation would be proposed by the contractor and approved by the CO. The water tank shall be cleaned, scrubbed, and disinfected after work is completed. Questions shall be emailed to tony.taylor@usda.gov. Questions are due by 12:00 noon (MT) on July 24, 2024. Answers are expected to be provided within 3 business days after the deadline. Questions received after the deadline may not be addressed PROJECT LOCATION The project is located on the Bridgeport Ranger District housing compound 5 miles North of Bridgeport, California (38.278844, -119.294987) on US-395. Travel South on US-395 from Carson City for 75 miles towards Bridgeport, California. 5 miles before the town of Bridgeport, turn west at the Buckeye Road intersection to the Bridgeport Warehouse. The access road to the tank is through the warehouse yard. MAGNITUDE OF CONSTRUCTION PROJECT The estimated price for this project is between $25,000 and $50,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated Period of Performance is August 26, 2024, to November 1, 2024.
Post-Bid
Conservation and Development
$50,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2024
August 26, 2024
To Be Determined, Sparks, NV
Related To This Project
Sparks, NV
Bid Date: Sep 18 2024
Sparks, NV
Bid Date: Aug 26 2024
Sparks, NV
Bid Date: Aug 28 2024
Sparks, NV
Bid Date: Sep 04 2024
Sparks, NV
Bid Date: Dec 05 2024
Sparks, NV
Bid Date: Sep 27 2024
Sparks, NV
Bid Date: Oct 03 2024
Sparks, NV
--
Sparks, NV
--
Sparks, NV
Bid Date: Jun 14 2024
Sparks, NV
Bid Date: Jul 10 2024
Sparks, NV
Bid Date: Jun 13 2024
Sparks, NV
Bid Date: Jun 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.