BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Fort Defiance, Arizona. Completed plans call for the renovation of a clubhouse / community center.

The contractor will furnish all equipment, materials and labor to complete the site Work relating to this project and will demolish and dispose of all material relating to the deconstruction of the existing fixtures required to complete improvements. Materials will be used, recycled or disposed of as applicable All unit installation and equipment shall not be proprietary as all information relating to the equipment and installation upon completion shall become property of the Navaj Nation to include any software or codes used for maintenance or repair of each system Through training shall be furnished to the DALTCS site Personnel by the contractor on all installed equipment and material upon completion of each HVAC system installation with follow up training as requested by DALTCS. The contractor will be responsible for construction related clean up and debris disposal. Contractors will also isolate work areas to minimize impact to non-work-related clean space; however, some dust and debris should be expected. Contractor will supply all nails, screws, adhesive, caulking, roofing curb, gas regulation, cement, vents, deflectors, fabrication of the new ducts, tape and cement to seal all joints and penetration, roof caps, electrical wires, thermostats, cords and categorical part required to complete this project. All leaks that occur after initial installation will be the responsibility of the installer for a period of five years. All building penetration must be sealed tight to avoid leaks and air infiltration. Any questions or inquiries can be directed to: Lesita T Desiderio, Program Supervisor II, DALTCS Telephone Number: (928) 729-4460 EMAIL : Lesita.Desiderio@navajonsn.gov The contractor will furnish all equipment, materials and labor to complete the site Work relating to this project and will demolish and dispose of all material relating to the deconstruction of the existing fixtures required to complete improvements. Materials will be used, recycled or disposed of as applicable All unit installation and equipment shall not be proprietary as all information relating to the equipment and installation upon completion shall become property of the Navaj Nation to include any software or codes used for maintenance or repair of each system Through training shall be furnished to the DALTCS site Personnel by the contractor on all installed equipment and material upon completion of each HVAC system installation with follow up training as requested by DALTCS. The contractor will be responsible for construction related clean up and debris disposal. Contractors will also isolate work areas to minimize impact to non-work-related clean space; however, some dust and debris should be expected. Contractor will supply all nails, screws, adhesive, caulking, roofing curb, gas regulation, cement, vents, deflectors, fabrication of the new ducts, tape and cement to seal all joints and penetration, roof caps, electrical wires, thermostats, cords and categorical part required to complete this project. All leaks that occur after initial installation will be the responsibility of the installer for a period of five years. All building penetration must be sealed tight to avoid leaks and air infiltration.

Post-Bid

Clubhouse / Community Centers

$470,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
1
Bidding Soon
53
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

August 22, 2024

img_map_placeholder

To Be Determined, Fort Defiance, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.