Renovation of a clubhouse / community center in Fort Defiance, Arizona. Completed plans call for the renovation of a clubhouse / community center.
The contractor will furnish all equipment, materials and labor to complete the site Work relating to this project and will demolish and dispose of all material relating to the deconstruction of the existing fixtures required to complete improvements. Materials will be used, recycled or disposed of as applicable All unit installation and equipment shall not be proprietary as all information relating to the equipment and installation upon completion shall become property of the Navaj Nation to include any software or codes used for maintenance or repair of each system Through training shall be furnished to the DALTCS site Personnel by the contractor on all installed equipment and material upon completion of each HVAC system installation with follow up training as requested by DALTCS. The contractor will be responsible for construction related clean up and debris disposal. Contractors will also isolate work areas to minimize impact to non-work-related clean space; however, some dust and debris should be expected. Contractor will supply all nails, screws, adhesive, caulking, roofing curb, gas regulation, cement, vents, deflectors, fabrication of the new ducts, tape and cement to seal all joints and penetration, roof caps, electrical wires, thermostats, cords and categorical part required to complete this project. All leaks that occur after initial installation will be the responsibility of the installer for a period of five years. All building penetration must be sealed tight to avoid leaks and air infiltration. Any questions or inquiries can be directed to: Lesita T Desiderio, Program Supervisor II, DALTCS Telephone Number: (928) 729-4460 EMAIL : Lesita.Desiderio@navajonsn.gov The contractor will furnish all equipment, materials and labor to complete the site Work relating to this project and will demolish and dispose of all material relating to the deconstruction of the existing fixtures required to complete improvements. Materials will be used, recycled or disposed of as applicable All unit installation and equipment shall not be proprietary as all information relating to the equipment and installation upon completion shall become property of the Navaj Nation to include any software or codes used for maintenance or repair of each system Through training shall be furnished to the DALTCS site Personnel by the contractor on all installed equipment and material upon completion of each HVAC system installation with follow up training as requested by DALTCS. The contractor will be responsible for construction related clean up and debris disposal. Contractors will also isolate work areas to minimize impact to non-work-related clean space; however, some dust and debris should be expected. Contractor will supply all nails, screws, adhesive, caulking, roofing curb, gas regulation, cement, vents, deflectors, fabrication of the new ducts, tape and cement to seal all joints and penetration, roof caps, electrical wires, thermostats, cords and categorical part required to complete this project. All leaks that occur after initial installation will be the responsibility of the installer for a period of five years. All building penetration must be sealed tight to avoid leaks and air infiltration.
Post-Bid
Clubhouse / Community Centers
$470,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2024
August 22, 2024
To Be Determined, Fort Defiance, AZ
Related To This Project
Fort Defiance, AZ
Bid Date: Aug 23 2024
Fort Defiance, AZ
Bid Date: Aug 23 2024
Fort Defiance, AZ
Bid Date: Aug 15 2024
Fort Defiance, AZ
Bid Date: Jul 30 2024
Fort Defiance, AZ
Bid Date: Aug 19 2024
Fort Defiance, AZ
Bid Date: Aug 20 2024
Fort Defiance, AZ
Bid Date: Aug 16 2024
Fort Defiance, AZ
Bid Date: Dec 19 2024
Fort Defiance, AZ
Bid Date: Jul 23 2024
Fort Defiance, AZ
Bid Date: Jul 08 2024
Fort Defiance, AZ
Bid Date: Aug 30 2024
Fort Defiance, AZ
Bid Date: Jun 25 2024
Fort Defiance, AZ
Bid Date: May 24 2024
Fort Defiance, AZ
Bid Date: Jun 20 2024
Fort Defiance, AZ
Bid Date: May 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.