Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 15, 2024 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in Midland, Pennsylvania. Completed plans call for the construction of a 78,000-square-foot parking garage; for site work for a parking garage; pre-engineered storage facility; and pre-engineered storage facility.
New Operations Center Phase 1 - Electrical Construction. Question Deadline 08/01/2024 Questions Will Be Accepted Until Online. via Email: Cmagee@corepgh.com. A. A Certified Check, Bid Bond or a Combination of Both Totaling an Amount Equal to Ten Percent (10%) of the Total Amount of the Base Bid Plus Any Add Alternates and Made Payable to the Owner, Must Accompany Each Bid. B. Project Description/ Narrative New One-story, 78,000gsf, Pre-engineered Metal Building Consisting of a Large Warehouse Storage Space, Office Wing, and Fleet Garage Wing. The Warehouse Includes Both Caged and Enclosed Secure Storage. The Office Wing Includes Lobby, Offices, Mail Room, Kitchenette Break Room, Storage, and Data Rooms. The Fleet Garage Includes: 8 Garage Bays, a Workshop/heavy Equipment Storage and Additional Secure Storage. Bids Shall Be Submitted for the Following Prime Contracts: 8200-21-02-gc General Construction 8200-21-02-mc Mechanical Construction 8200-21-02-ec Electrical Construction 8200-21-02-tc Technology Construction 8200-21-02-pc Plumbing Construction 8200-21-02-fp Fire Protection Construction the Pennsylvania Cyber Charter School is Requesting Bids to Be Made and Will Award the Contract to the Lowest Responsible Bidder(S) as More Thoroughly Described in the Contract Documents. The Owner Reserves the Right to Reject Any or All Bids, and/or to Waive Any Informality, Infirmity, Omission, Defect, Irregularity and/or Disqualifying Error in Any Bid. C. The Owner Anticipates Awarding Contracts Within Thirty (30) Days of the Bid Opening. No Bona Fide Bids Shall Be Altered or Withdrawn for a Period of Sixty (60) Days After the Bid Opening. D. All Bids Shall Be Clearly Marked With the Contractor's Name and Prime Contract Number and Name.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$1,655,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2024
September 2, 2024
S 12th St, Midland, PA
Related To This Project
Midland, PA
Bid Date: Aug 08 2024
Midland, PA
Bid Date: Aug 08 2024
Midland, PA
Bid Date: Aug 08 2024
Midland, PA
Bid Date: Aug 26 2024
Midland, PA
Bid Date: Mar 07 2025
Midland, PA
Bid Date: Dec 09 2024
Midland, PA
Bid Date: Feb 07 2025
Midland, PA
Bid Date: Mar 13 2025
Midland, PA
Bid Date: Aug 08 2024
New Operations Center Phase 1 For the Pennsylvania Cyber Charter - Technology Construction - 5470630
Midland, PA
Bid Date: Aug 08 2024
Midland, PA
Bid Date: Jun 19 2024
Midland, PA
Bid Date: Feb 12 2024
Midland, PA
Bid Date: Mar 25 2019
Midland, PA
Bid Date: Feb 22 2021
Midland, PA
Bid Date: Aug 02 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.