EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Sayreville, New Jersey. Completed plans call for the renovation of a municipal facility.

NETA Standby Maintenance Testing and High Voltage Electrical Repairs with Standby Services Each Bidder must submit with its Bid, Bid Security in the amount, form and subject to the conditions set forth in the RFB. Bidders must also submit a Consent of Surety as set forth in the RFB, demonstrating that in the event of an award of the Contract to the Bidder, the Surety will furnish the required Contract Bond(s) in the sum(s) required by the RFB. Bids may not be emailed, faxed or transmitted over the telephone. Bidders are required, as applicable to this RFB, to comply with the requirements of the Prevailing Wage Act (N.J.S.A. 34:11-56.25 et seq.); the Public Works Contractor Registration Act (N.J.S.A. 34:56-48); the Business Registration Act (N.J.S.A. 52:32-44); the State's Equal Employment Opportunity and Affirmative Action Laws and Regulations (N.J.S.A. 10:2-1 et seq., N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-3.7 and 3.8); the Americans with Disabilities Act (42 U.S.C. 12101); and the New Jersey Campaign Contributions and Expenditure Reporting Act (N.J.S.A. 19:44A-1 et seq.). Bidders' attention is also called to comply with the requirements as applicable, of (a) the conditions of employment and requirements of Federal prevailing wage rates; and (b) Segregated Facility. Any questions regarding this RFB should be directed to Judy McCrone, at jmccrone@mcua.com, as set forth in the RFB. The Authority reserves the right to waive any informalities or reject any and all bids in accordance with the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq., as well as any other applicable law. A. The Contractor is to furnish all labor, materials and equipment required for the project and related construction for the bid price. The work is to be coordinated by the Contractor with a Project Manager located on the construction site. B. The contract will include furnishing all labor, materials, equipment, facilities, and services for the construction of the overall work. The Contract shall include all appurtenant work as particularly indicated, shown, or described in the Specifications and Contract documents. C. All bidders should walk the site to familiarize themselves with the nature of the work involved. Visits may be arranged by contacting Lisa Oberreiter (Extension 220). Failure to walk and become familiar with the site does not release the Contractor from any prices bid or clauses of the contract should the actual field conditions deviate from the drawings and/or specifications.

Award

Municipal

$5,380,600.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Execution and Closeout Requirements, Execution, Application, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Spare Parts
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding, Suspended Scaffolding
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
563
Active Projects
321
Bidding Soon
5,063
All Active Projects
2,381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

September 13, 2024

img_map_placeholder

Multiple Locations, Sayreville, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

NETA Standby Maintenance Testing and High Voltage Electrical Repairs with Standby Services

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.