BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Demolition, site work, paving and new construction of a mixed-use development in Laona, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

20250211033. 1590-18-71 Monico - Laona, STH 55 South to Otter Creek Road, USH 008 Forest County 1590-18-81 Monico - Laona, Otter Creek Road to STH 32 South, USH 008 Forest County 1590-18-82 Monico - Laona, Multi Modal Tunnel, USH 008 Forest County 1590-18-83 Monico - Laona, Firekeeper Road to Bug Lake Road, USH 008 Forest County 9813-02-70 WISC 2025334 USH 8 Shared Pathway Phase 1, Firekeeper Road to Love Knot Lane, NON HWY Forest County Work Summary: Removals, Milling, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Structure Replacement, Structure Rehabilitation, Culvert Pipe, Curb and Gutter, Concrete Sidewalk, Storm Sewer, Erosion Control, Permanent Signing, Traffic Control, Pavement Marking, Sanitary, Water, Restoration. Work Type: A DBE Goal: 3% Completion Date Contract: October 31, 2025 Guaranty Required: $440,000.00 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Question Deadline 02/10/2025 at 11:45 AM CT, Any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. Native American Hiring Requirements WI DOT - 033 - Monico - Laona, USH 8 Shared Pathway Phase 1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$17,389,817.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

794

9

8

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
20
Bidding Soon
354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.