BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Midland City, Alabama. Completed plans call for the renovation of a water / sewer project.

the Project Consists of the Material, Labor and Equipment to Size, Provide, Install, Test and Commission the Following at the Midtown Pump Station (52 Private Road #1511, Midland City, Al); One (1) Permanent Mounted Backup Generator, to Include but Not Limited to, One (1) Complete and Operable Standby Power System, One (1) Generator Set With Nema 3r Enclosure, One (1) Base Mount Fuel Tank Sized for 72 Hours of Operation, Fence and Double Gate Surrounding Generator, One (1) Automatic Transfer Switch With Nema 3r Enclosure, the Design and Construction of One (1) Concrete Foundation, and All Appurtenances. Include Also, All Required Site Work and Site Restoration, Start-up and Owner Training, as-built Drawings Provided in Owner-specified Format, All Related Electrical Works-complete With All Accessories, Including but Not Limited to All Field Wiring, Any Required Resizing of, or Additions to, Existing Conduit, as Required to Have Turn-key Operation. The Owner Reserves the Right to Waive Any Informality or to Reject Any or All Bids. Each Bidder Must Deposit With His Bid, Security in the Amount, Form, and Subject to the Conditions Provided in the Information for Bidders. Each Bidder Shall Comply With All Applicable State and Local Laws Concerning Licensing, Registration, and Regulation of Firms Doing Business in the State of Alabama. The work under this Section includes all excavation, backfill, compaction, pavement removal, site restoration and cleanup for the construction of underground pipelines, and their related structures. DESCRIPTION This Section covers requirements for new chain link fencing. Include posts, rails, fence fabric, miscellaneous frame work, gate assemblies, and all accessories and parts required for a complete installation as shown on the Drawings, specified herein or directed. Where new fencing is connected to an existing fence, new fencing shall match the height and line of existing fencing, except as otherwise shown.

Award

Water / Sewer

$91,620.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
30
Bidding Soon
409
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 29, 2024

img_map_placeholder

52 Pr 1511, Midland City, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.