BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Foster City, California. Conceptual plans call for site work for a road / highway.

The City's traffic signal system was evaluated as part of the Bicycle, Pedestrian, and Intersection Evaluation Study (CIP 301-664). This part of the study focused on inventory of the existing traffic signal infrastructure network and identified opportunities to improve efficiency through either equipment or operations enhancements. This project is built upon recommendations from CIP 301-664 and will include the following tasks for design and construction: 1. Citywide Communications Upgrade 2. Traffic Signal Field Hardware a. Vehicle and Pedestrian Signal Heads Replacement - This will require replacement of the traffic signal and pedestrian framework and installation of new light-emitting diode (LED) indications will refresh the City's traffic signal equipment. City of Foster City's FY 2024-25 Final Budget Page 291 b. Accessible Pedestrian Signals (APS) Replacement - This will require each APS unit (pedestrian push button) to be hardwired individually back to the traffic control cabinet. 3. Traffic Signal Cabinets Upgrade to NEMA TS-2 - Upgrade will maximize detection input opportunities (64-channels) and offer robust maintenance features that can be viewed at the central computer system. 4. Traffic Signal Controllers Replacement - Replacement of the existing traffic signal controllers that use either Ethernet or Fiber Optic cables will provide the City with the option to implement enhanced features. 5. Advanced Traffic Management System (ATMS) (Central Computer System Upgrade) - A new ATMS Central Computer System will provide an enhanced user interface with access to special functions such as traffic signal coordination, basic timing data access and modification, historical data queries, and user account privileges. The City needs to consider how best to upgrade its network and potentially introduce enhancement of additional City services. Due to the complexity of the project, a technical memorandum will be prepared by a professional traffic engineering consultant that will compare the various upgrade alternatives and associated costs, provide recommendations for the preferred system based on the City's current and future needs, recommend a phasing plan for design and construction of the improvements, and prepare a schedule for implementation. A Technical Memorandum will be prepared by one of the City's on-call Traffic Engineering firms. The project is include in the city's 2023-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$625,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
170
Bidding Soon
3,165
All Active Projects
1,290
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 2, 2026

img_map_placeholder

Multiple Locations, Foster City, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.