Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in La Vista, Nebraska. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Identified as the 84th St Trail, GilesHarrison, La Vista, the project is approximately 1 mile in length and is located on 84th St. in the City of La Vista, starting approximately at the intersection of 84th and Harrison and extending south to the intersection of 84th and Giles. Construction may begin and/or end approximately 500 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement. The purpose of this project is to improve and expand alternative transportation options and recreational opportunities in the City of La Vista (City) and improve connectivity to Central Park and City Centre. The project is consistent with the City Capital Improvement Program and Park and Recreation Master Plan. The need for the project is to provide safe and unrestricted pedestrian access across 84th St. connecting the City west of 84th St. and the City east of 84th St. The project would facilitate future connection of existing trails between Park View Blvd. west of 84th St. and Edgewood Blvd. east of 84th St. The project would further provide increased access and community neighborhood connections to Central Park and City Centre venues. Minor grading would be required where the underpass is constructed to match existing grading. The improvements on this project would consist of constructing a pedestrian trail on both sides of 84th St. from Giles Rd. to Harrison St. and an underpass under 84th St. along the existing Thompson Creek. The underpass would facilitate the construction of a bridge on 84th St. carrying existing traffic lanes and accommodating the proposed pedestrian trails on both the east and west sides of 84th St. The bridge over Thompson Creek and the new pedestrian trail would be constructed as a new structure. A grade raise is not anticipated. Guardrail would be replaced. The proposed project would require the acquisition of additional property rights, which could include permanent easements (PE), and/or temporary easements (TE). If your property is impacted by this project, you will be contacted by a representative once the design footprint has been established. Access to adjacent properties would be maintained during construction but may be limited at times due to traffic phasing requirements. Work would be required in the waterway. The trail corridor is anticipated to impact wetland resources along the project. The construction of the trail is anticipated to have limited impacts to publicly owned parks or recreation areas with some grading and the trail extending into Central Park along the parks western boundary. Mitigation would occur as needed to minimize impacts. This project would be constructed under traffic with lane closures controlled by appropriate traffic control devices and practices. Phasing requirements for the underpass on 84th St. would temporarily impact access to nearby intersections. 84th St. traffic would be reduced to one-lane in each direction between approximately City Centre Drive and Park View Blvd. The proposed project is currently in the preliminary design phase. The project is tentatively scheduled to begin construction as early as fall of 2025 with completion anticipated by winter of 2026.
Final Planning
Roads / Highways
$100,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2024
84th St, La Vista, NE
Related To This Project
La Vista, NE
Bid Date: Jul 29 2024
La Vista, NE
Bid Date: Aug 05 2024
La Vista, NE
--
La Vista, NE
Bid Date: Sep 16 2024
La Vista, NE
Bid Date: Aug 19 2020
La Vista, NE
Bid Date: Oct 25 2024
La Vista, NE
--
La Vista, NE
Bid Date: Jul 26 2024
La Vista, NE
Bid Date: Jul 26 2024
La Vista, NE
Bid Date: Jul 11 2024
La Vista, NE
Bid Date: Jul 18 2024
La Vista, NE
Bid Date: May 07 2024
La Vista, NE
Bid Date: Apr 18 2024
La Vista, NE
Bid Date: Dec 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.