BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work for a water / sewer project in Santa Fe, New Mexico. Completed plans call for site work for a water / sewer project.

**As of July 24th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Canyon Road Water Treatment Plant Treatment Plant Flocculation and Flocculation and Sedimentation Sedimentation Improvements CIP ements CIP Number 39115 Number 39115 DWSRF-6522 & -6522 & WPF-6314 This project is wholly or partially funded with United States En-vironmental Protec-tion Agency funds and, therefore, must com-ply with all federal re-quirements contained In the Supplemental Conditions. Neither the United States nor its department's agen-cies or employees is on will be party to this in-vitation for bids or any resulting contract. Improvements to flocculation and sedimentation components of the Canyon Road Water Treatment Plant (CRWTP), located at 1780 Upper Canyon Road, Santa Fe, New Mexico 87501. The project includes, but is not limited to, the following scope items: · Demolition of existing clarifier equipment (tube settlers, launders, sludge rakes, etc.); · Structural additions (concrete slabs within each clarifier, flocculation walls, bifurcation walls within each clarifier; inlet splitter boxes, walkways, and settled water channels); · New flocculation and sedimentation equipment (vertical paddlewheel flocculators, lamella plate settlers, and hose less residuals collectors); · All associated power, controls, process and chemical piping, and valves; · A new flocculation MCC electrical building with associated grading and paving, including potable water yard piping relocation, and all associated instrumentation, electrical, architectural, and HVAC design components as required for proper function; · Residuals blowdown pump replacement; · A flocculation aid polymer system; · Repair and reconstruction of existing improvements affected by the Work; · Incidentals for a complete and usable plant. *Addendum Description: Amendment 1 & 2 add to plan room. Improvements to flocculation and sedimentation components of the Canyon Road Water Treatment Plant (CRWTP), located at 1780 Upper Canyon Road, Santa Fe, New Mexico 87501. The project includes, but is not limited to, the following scope items: · Demolition of existing clarifier equipment (tube settlers, launders, sludge rakes, etc.); · Structural additions (concrete slabs within each clarifier, flocculation walls, bifurcation walls within each clarifier; inlet splitter boxes, walkways, and settled water channels); · New flocculation and sedimentation equipment (vertical paddlewheel flocculators, lamella plate settlers, and hose less residuals collectors); · All associated power, controls, process and chemical piping, and valves; · A new flocculation MCC electrical building with associated grading and paving, including potable water yard piping relocation, and all associated instrumentation, electrical, architectural, and HVAC design components as required for proper function; · Residuals blowdown pump replacement; · A flocculation aid polymer system; · Repair and reconstruction of existing improvements affected by the Work; · Incidentals for a complete and usable plant. Deadline for Pre-Bid Questions - From: April 29, 2025, 5:00 PM MST To: May 13, 2025, 5:00 P.M. MST

Award

Water / Sewer

$4,000,000.00

Public - City

Site Work

160

27

104

9

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
1
Bidding Soon
177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 3, 2025

Project location map

Canyon Rd, Santa Fe, NM


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.