BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Phippsburg, Maine. Working plans call for site work for a water / sewer project.

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) on behalf of the United States Navy (USN) for maintenance dredging of two portions of the Federal Navigation Project (FNP) in the lower Kennebec River, Maine. This will be an unrestricted competitive IFB procurement requiring a hydraulic hopper dredge to perform the work. The NAICS code for the work is 237990 with a size standard of $37M. The construction will extend over a 3-4 week period. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The work involves maintenance dredging for the USN of two portions of the authorized, 27-foot deep, 500-foot wide FNP in the lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works. The work will restore the channel to its authorized dimensions and involves removal of a total of about 50,000 cubic yards (cy) of clean sand. Approximately 40,000 cy of material will be removed from the Doubling Point area (i.e., just below Bath) and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to a maximum elevation of -34' MLLW to improve the chance that adequate depths will endure. The 40,000 cy to be removed from the channel at Doubling Point includes approximately 30,000 cy of advance maintenance dredging. Material dredged from the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 95-100 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site just northwest of the previously used Jackknife Ledge placement site and in about 40-50 feet of water. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2024 to 1 March 2025. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission (which may include definitive responsibility criterion) and the response date will be available on or about July 24, 2024. Neither telephonic, mailed nor fax requests for hard copies will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). To download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/), solicitation module. Amendments, if any, to the solicitation will be made available at the PIEE website. Registrants are responsible for the accuracy of the information on the SAM.gov Registration List. All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Elizabeth.k.glasgow@usace.army.mil. This notice does not commit the U.S. Government to contract for any supply or service. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
63
Bidding Soon
1,079
All Active Projects
317
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2024

March 1, 2025

img_map_placeholder

To Be Determined, Phippsburg, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.