Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Demolition, site work, renovation and addition to an educational facility in Arlington, Texas. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
https://www.spartnerships.com/ut-arlington-campus-master-plan-project-updates/ The University of Texas at Arlington (UT Arlington) recently held a town hall to share major updates for the Campus Master Plan. The university outlined new infrastructure plans, including modernizing the entrance to the campus and building a boutique hotel, residential halls and additional work on academic facilities. The most notable aspect of the announcement concerned UT Arlington’s plans to update its welcome mat by creating “gateways” and a “front door” for the campus. Officials stated that the front door will follow similar design principles to the existing main entrance for visitors and potential students. Currently, three gateways have been identified for the update. In addition to updated entrances, the university will rework its campus design to incorporate more greenspaces. The vision calls for converting surface parking lots into expanded greenspace areas with trees, grass and other landscaping. UT Arlington is also planning to replace the majority of the available surface parking lots with garages to shrink the parking footprint and free up extra space for facilities. The updates presented at the town hall represent the latest in upcoming expansion plans slated for the campus. UT Arlington has divided the Master Plan across five primary sites: North Gateway. Campus Front Door. Campus Nexus. Campus Link. Creek Corridor North. Plans for the North Gateway section of the campus will include several notable expansions to academic facilities. Among the new construction projects, the North Gateway will host a new boutique hotel with an accompanying conference center. Additional construction will include a new performing arts center, a transit hub multiple academic buildings and student life and housing facilities. The Campus Front Door will significantly revamp how the campus welcomes its visitors. Notably, this area will feature greatly expanded student housing and student life functions. Additional plans include expanding the University Center and nanofab facility. The university will also build a new academic and research building with a green buffer around the entirety of the campus edge. The Campus Nexus – located in the heart of the university – will propose expanding the Central Library with the intent to eventually extend the Library Mall as part of the university’s short- and long-term vision. The northern edge of Library Mall will be converted into an academic and student life building. In addition, UT Arlington will create an academic and research neighborhood to increase space for academic functions. For the Campus Link portion of the project, the university will redevelop the area’s edge to improve connectivity and mobility through better pedestrian amenities and micromobility infrastructure. A new mixed-use neighborhood is planned for this space, providing housing with 1,000 beds, a student life hub building, dining, recreation and collaboration space. The final major section featured in the Master Plan centers around Creek Corridor North with plans for significant expansion. The university will expand the west residential neighborhood to provide high-density housing and structured parking. The expansion will replace existing tennis courts, surface parking and apartments. UT Arlington plans to expand and renovate the Maverick Activities Center (MAC) and build several new academic buildings to replace existing outdated facilities. Additional work will include building outdoor courtyards, open spaces, plazas and a chiller plant. While these areas cover some of the more prominent focuses featured in the Master Plan, they are not the only planned capital projects included in the university’s efforts to reshape its campus footprint. For athletics and recreational needs, the university will build an athletics building and gateway, improve the track and soccer field, add tennis courts and a new multipurpose recreational field. For academic buildings, the project vision calls for replacing the Science Hall and Earth and Environmental Sciences Building. The university will expand Hammond Hall, renovate the College of Business, Fine Arts and College of Architecture, Planning and Public Affairs buildings. Additional work calls for building a new Physical Education and Recreation building, Student Life and Recreation Building, Health Center and Centennial Courts Addition. UT Arlington has recognized that, as part of the Master Plan vision, all campus residents and visitors will require reliable, safe mobility options to navigate throughout the university. To accommodate these needs, the university will rework and update its pedestrian, bikeway and vehicular networks to provide better connections to critical amenities and learning spaces. UT Arlington will also invest in the creek corridor to promote and sustain the campus’ natural beauty, ecosystem and resiliency. Several on-campus projects associated with the Master Plan are already underway. Thes include: Renovations to the Cooper Street Bridges. Renovations for the Greek Life Community Center. Expansions and renovations for the Life Sciences building. Upgrades for Maverick Hall. Conduction of studies on the School of Social Work site. Revitalization of the Library Mall. Renovation and expansion of the University Center. Photo by University of Texas at Arlington Photograph Collection, CC BY 4.0 , from Wikimedia Commons This story is a part of the weekly Texas Government Insider digital news publication. See more of the latest Texas government news here. For more national government news, check Government Market News daily for new stories, insights and profiles from public sector professionals. ------------------------------------- https://www.theshorthorn.com/news/construction-projects-across-campus-continue/article_7bc4e52f-d685-4398-9c21-f03eb3a65fef.html Across the country, public school energy and facility leaders are being asked to do more with even less. Aging buildings, shifting political priorities, and shrinking budgets are making it harder to plan and invest wisely in facility improvement projects. The traditional approach to capital planning, once guided by predictable funding and long-term timelines, no longer fits today’s reality. Instead, district leaders must adopt flexible, data-driven facility planning strategies that prioritize operational efficiency, reduce risk, and make every dollar count. Eliminating cost volatility through Capital Asset Planning In many districts, capital planning is reactive. Maintenance is deferred until systems fail, leading to emergency repairs that disrupt operations and drive up costs. This cycle is not only expensive—it’s unsustainable. And with most school buildings well past their prime, districts are increasingly vulnerable to financial risk. The American Society of Civil Engineers (ASCE) highlights this issue in its 2025 Infrastructure Report Card, urging districts to adopt life-cycle cost analysis to evaluate the full cost of projects—including operations and maintenance (O&M)—and achieve the lowest long-term cost. Capital Asset Planning (CAP) is one proactive solution to this problem: Strategic Roadmap: Software provides detailed asset data and lifecycle forecasts, helping leaders plan ahead, allocate resources wisely, and avoid costly surprises. Risk Reduction: By identifying vulnerabilities early, CAP enables districts to take preventive action before issues escalate into emergencies. Implementing CAP begins with a comprehensive inventory of district assets. This includes onsite audits and data collection for major systems such as HVAC, kitchen equipment, IT infrastructure, and mechanical operations. Key data points—like square footage, equipment type, maintenance history, and replacement costs—are also captured and analyzed to inform smarter decision-making. With this foundation, facility leaders can shift from reactive fixes to strategic investments, reducing risk and improving operational continuity. Creating a strategic capital improvement roadmap Capital improvement planning is less sustainable when it’s structured around solving only the most urgent, short-term facility needs. Alternatively, a well-crafted capital improvement roadmap should prioritize short-term wins that solve urgent problems and financially pave the way for long-term, wish list improvements. Prioritize projects that safeguard operational continuity. Focus on investments like these that protect your district’s ability to operate smoothly and meet future demands: Modernize learning environments to attract and retain students Address deferred maintenance to prevent costly disruptions Align budget and staffing resources to better support core district priorities These projects help ensure your schools remain safe, functional, and competitive. Prioritize projects that reduce Operations and Maintenance (O&M) costs. O&M is a major expense—but one that can be reduced through smart upgrades. Consider projects that: Install LED lighting to lower energy use and maintenance costs Implement smart building controls for better efficiency and oversight Upgrade plumbing and HVAC systems to conserve water and reduce utility bills Adopt clean energy technologies to stabilize long-term energy costs and improve resilience to severe weather events Savings from these improvements can be reinvested into academic programs, staffing, and student services. Explore innovative funding options and project delivery models. High upfront costs often stall progress, but alternative financing can help districts move forward: Use Energy Savings Performance Contracts (ESPCs) to fund upgrades by capturing and reinvesting energy savings Leverage (and stack!) grants, rebates, and public-private partnerships to supplement limited budgets Bundle projects to maximize impact and streamline procurement Creative funding strategies can unlock critical improvements without straining district finances. Minimize risk and avoid cost volatility through smart facility planning Anchoring capital planning with the best available software, data, and a roadmap suited to your district’s unique needs will help facility leaders more effectively reduce risk, control costs, and better serve their students. A partner like Schneider Electric can help districts transform aging infrastructure into a foundation for future success. To learn more, download our guide to unlocking K-12 budget stability through facility modernization. ------------------------------------------------------------------------------- Located at the corner of 1st St. and S. Oak St., the University Center (UC) opened in 1953 and is prominently situated on the north side of campus, serving as a hub for student activity and campus-wide events. The project entails the demolition of approximately 148,500 GSF of the existing 236,500 GSF, renovating the approximately 88,000 remaining GSF, and adding approximately 174,000 GSF of new construction, totaling 262,000 GSF. This project is identified as Building #SP04 on the Campus Master Plan and listed on THECB Capital Expenditure Plan (MP1) as priority #6. The UC is home to various meeting rooms, ballrooms, entertainment facilities, and Dining Services, along with several student resources, including the Career and Development Center, Office of New Maverick Orientation, Fraternity and Sorority Life, Intercultural Student Engagement Center, Student Government, and Student Publications (The Shorthorn). Since its initial construction, the UC has undergone ten expansions, responding to the needs of a continuously changing student population. The result is an inefficient facility that is inadequate to serve the needs of the campus. OWNER’S RESERVATION OF RIGHTS: The Owner may evaluate the Qualifications based on the anticipated completion of all or any portion of the Project. The Owner reserves the right to divide the Project into multiple parts, to reject any and/or all Qualifications and re-solicit for new Qualifications, or to reject any and/or all proposals and temporarily or permanently abandon the Project. Owner makes no representations, written or oral, that it will enter into any form of agreement with any respondent to this RFQ for any project and no such representation is intended or should be construed by the issuance of this RFQ. PREVAILING MINIMUM WAGE RATE DETERMINATION: Respondents are advised that the Texas Prevailing Wage Law applies to this Project will be administered in accordance with the University of Texas General Conditions for Building Construction Contracts and the policies and procedures set forth in the U. T. System document, entitled "Prevailing Wage Guidelines." A copy is attached to the Special Conditions. The Owner designates the following person, as its representative and Point-of-Contact for this RFQ. Respondents shall restrict all contact with the Owner and direct all questions regarding this RFQ, including questions regarding terms and conditions, to the Point-ofCon tact person. Viki Lewis, Senior Financial Analyst The University of Texas Arlington Office of Facilities Management 1225 W. Mitchell St., Suite 205 Arlington, TX 76019 Phone: (817) 272-0192 e-mail: vlewis@uta.edu Deadline for submitting questions will be Thursday, July 19, 2024 at 2:00p.m. Event Bid notes: The Owner will receive Qualifications at the time and location described below. The University of Texas at Arlington Office of Facilities Management 1225 West Mitchell Street, Suite 205 Arlington, TX 76019 Submit one (1) original and seven (7) identical copies of the Qualifications and one (1) PDF copy on flash drive. An original signature must be included on the “Respondent’s Statement of Qualifications and Ability to Undertake the Project” document submitted with each copy. Submit one (1) original and one (1) copy of the HUB Subcontracting Plan (HSP) as separate attachments to the Qualifications as described in Section 5.2. Any clarifications or interpretations of this RFQ that materially affect or change its requirements will be posted by the Owner as an addendum on the Electronic State Business Daily (ESBD) website at online. It is the responsibility of all respondents to obtain this information in a timely manner. All such addenda issued by the Owner before the proposals are due as part of the RFQ, and respondents shall acknowledge receipt of and incorporate each addendum in its Qualifications. Attendance at the pre-submittal conference is optional. A guided tour of the University Center will be the only opportunity for respondents to view the Project Site before the submittal. Attendance at the pre-submittal tour is optional. Parking: Maverick Parking Garage – 798 S West St., Arlington https://parking.honkmobile.com/hourly/zones/8050 HUB sub-contracting meeting (MANDATORY) There will be a mandatory “How to successfully complete the HUB Subcontracting Plan (HSP)” conference which will be held on July 15, 2024, at 4pm, following the Pre-Submittal Conference tour. All methods for completing the plan will be covered in the session, with time allotted for questions and answers. We encourage your HSP preparer’s attendance of this session to ensure meeting Texas HUB Subcontracting Plan requirements and avoid your bid being disqualified. Attendance at the HUB Subcontracting meeting is Mandatory. Responses from those that do not attend the HUB Subcontracting meeting will be rejected for failure to meet the mandatory meeting specification.
Post-Bid
Educational
$142,000,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
36
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2024
April 6, 2026
300 W 1st St, Arlington, TX
Related To This Project
Arlington, TX
Bid Date: Jul 29 2024
Arlington, TX
--
Arlington, TX
--
Arlington, TX
Bid Date: Aug 01 2024
Arlington, TX
Bid Date: Aug 06 2024
Arlington, TX
Bid Date: Aug 13 2024
Arlington, TX
--
Arlington, TX
Bid Date: Jul 10 2024
Arlington, TX
Bid Date: Jul 11 2024
Arlington, TX
Bid Date: Jul 30 2024
Arlington, TX
--
Arlington, TX
Bid Date: Jul 23 2024
Arlington, TX
--
Arlington, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.