BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Arlington, Texas. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Located at the corner of 1st St. and S. Oak St., the University Center (UC) opened in 1953 and is prominently situated on the north side of campus, serving as a hub for student activity and campus-wide events. The project entails the demolition of approximately 148,500 GSF of the existing 236,500 GSF, renovating the approximately 88,000 remaining GSF, and adding approximately 174,000 GSF of new construction, totaling 262,000 GSF. This project is identified as Building #SP04 on the Campus Master Plan and listed on THECB Capital Expenditure Plan (MP1) as priority #6. The UC is home to various meeting rooms, ballrooms, entertainment facilities, and Dining Services, along with several student resources, including the Career and Development Center, Office of New Maverick Orientation, Fraternity and Sorority Life, Intercultural Student Engagement Center, Student Government, and Student Publications (The Shorthorn). Since its initial construction, the UC has undergone ten expansions, responding to the needs of a continuously changing student population. The result is an inefficient facility that is inadequate to serve the needs of the campus. OWNER’S RESERVATION OF RIGHTS: The Owner may evaluate the Qualifications based on the anticipated completion of all or any portion of the Project. The Owner reserves the right to divide the Project into multiple parts, to reject any and/or all Qualifications and re-solicit for new Qualifications, or to reject any and/or all proposals and temporarily or permanently abandon the Project. Owner makes no representations, written or oral, that it will enter into any form of agreement with any respondent to this RFQ for any project and no such representation is intended or should be construed by the issuance of this RFQ. PREVAILING MINIMUM WAGE RATE DETERMINATION: Respondents are advised that the Texas Prevailing Wage Law applies to this Project will be administered in accordance with the University of Texas General Conditions for Building Construction Contracts and the policies and procedures set forth in the U. T. System document, entitled "Prevailing Wage Guidelines." A copy is attached to the Special Conditions. The Owner designates the following person, as its representative and Point-of-Contact for this RFQ. Respondents shall restrict all contact with the Owner and direct all questions regarding this RFQ, including questions regarding terms and conditions, to the Point-ofCon tact person. Viki Lewis, Senior Financial Analyst The University of Texas Arlington Office of Facilities Management 1225 W. Mitchell St., Suite 205 Arlington, TX 76019 Phone: (817) 272-0192 e-mail: vlewis@uta.edu Deadline for submitting questions will be Thursday, July 19, 2024 at 2:00p.m. Event Bid notes: The Owner will receive Qualifications at the time and location described below. The University of Texas at Arlington Office of Facilities Management 1225 West Mitchell Street, Suite 205 Arlington, TX 76019 Submit one (1) original and seven (7) identical copies of the Qualifications and one (1) PDF copy on flash drive. An original signature must be included on the “Respondent’s Statement of Qualifications and Ability to Undertake the Project” document submitted with each copy. Submit one (1) original and one (1) copy of the HUB Subcontracting Plan (HSP) as separate attachments to the Qualifications as described in Section 5.2. Any clarifications or interpretations of this RFQ that materially affect or change its requirements will be posted by the Owner as an addendum on the Electronic State Business Daily (ESBD) website at online. It is the responsibility of all respondents to obtain this information in a timely manner. All such addenda issued by the Owner before the proposals are due as part of the RFQ, and respondents shall acknowledge receipt of and incorporate each addendum in its Qualifications. Attendance at the pre-submittal conference is optional. A guided tour of the University Center will be the only opportunity for respondents to view the Project Site before the submittal. Attendance at the pre-submittal tour is optional. Parking: Maverick Parking Garage – 798 S West St., Arlington https://parking.honkmobile.com/hourly/zones/8050 HUB sub-contracting meeting (MANDATORY) There will be a mandatory “How to successfully complete the HUB Subcontracting Plan (HSP)” conference which will be held on July 15, 2024, at 4pm, following the Pre-Submittal Conference tour. All methods for completing the plan will be covered in the session, with time allotted for questions and answers. We encourage your HSP preparer’s attendance of this session to ensure meeting Texas HUB Subcontracting Plan requirements and avoid your bid being disqualified. Attendance at the HUB Subcontracting meeting is Mandatory. Responses from those that do not attend the HUB Subcontracting meeting will be rejected for failure to meet the mandatory meeting specification.

GC Bidding

Educational

$142,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

36

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
209
Bidding Soon
4,896
All Active Projects
1,872
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 31, 2024

December 15, 2025

June 26, 2028

img_map_placeholder

300 W 1st St, Arlington, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.