BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marbury, Alabama. Completed plans call for site work for a water / sewer project.

The contract provides for an assessment of an existing test well to include physical observation, test pumping, and water quality analysis, along with determination of influence on adjacent wells. Additionally, this contract provides for the exploration and testing of up to four (4) test wells on property already owned by Marbury Water System Marbury Water System seeks to make improvements to the water system and has obtained Drinking Water State Revolving Fund (DWSRF) American Rescue Plan Act (ARPA) assistance (Project No. FS010006-02) through the Alabama Department of Environmental Management (ADEM). Compliance with all applicable Federal, State, and local laws, rules, and regulations are required. A Performance Bond in an amount of one hundred percent (100%) of the contract cost and Labor and Material Payment Bond in an amount of one hundred percent (100%) of the contract cost in the form and terms approved by Marbury Water System will be required at the signing of the contract. In addition, the bidder must furnish Marbury Water System at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. The right is reserved to reject any and/or all bids and to waive informalities and to furnish any item of material or work to change the amount of said Contract. Bids shall be clearly identified on the exterior of the package with the bidder's name, address, the name of the project being bid, and time and place of the bid opening. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The Owner reserves the right to reject any or all bids and to waive technical errors if the best interest of the Owner will thereby be promoted. All bids received after the date and time of the bid opening noted above will be returned unopened.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
26
Bidding Soon
554
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

img_map_placeholder

To Be Determined, Marbury, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.