Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 26, 2024 at 8:00 PM
Updated August 29, 2024
Site work for a water / sewer project in Marbury, Alabama. Completed plans call for site work for a water / sewer project.
The contract provides for an assessment of an existing test well to include physical observation, test pumping, and water quality analysis, along with determination of influence on adjacent wells. Additionally, this contract provides for the exploration and testing of up to four (4) test wells on property already owned by Marbury Water System Marbury Water System seeks to make improvements to the water system and has obtained Drinking Water State Revolving Fund (DWSRF) American Rescue Plan Act (ARPA) assistance (Project No. FS010006-02) through the Alabama Department of Environmental Management (ADEM). Compliance with all applicable Federal, State, and local laws, rules, and regulations are required. A Performance Bond in an amount of one hundred percent (100%) of the contract cost and Labor and Material Payment Bond in an amount of one hundred percent (100%) of the contract cost in the form and terms approved by Marbury Water System will be required at the signing of the contract. In addition, the bidder must furnish Marbury Water System at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. The right is reserved to reject any and/or all bids and to waive informalities and to furnish any item of material or work to change the amount of said Contract. Bids shall be clearly identified on the exterior of the package with the bidder's name, address, the name of the project being bid, and time and place of the bid opening. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The Owner reserves the right to reject any or all bids and to waive technical errors if the best interest of the Owner will thereby be promoted. All bids received after the date and time of the bid opening noted above will be returned unopened.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2024
August 26, 2024
To Be Determined, Marbury, AL
Related To This Project
Marbury, AL
Bid Date: Feb 28 2025
Marbury, AL
Bid Date: Sep 02 2025
Marbury, AL
Bid Date: Apr 30 2024
Marbury, AL
Bid Date: Mar 19 2024
Marbury, AL
Bid Date: Aug 30 2022
Jasper, AL
Bid Date: Aug 01 2024
Montgomery, AL
Bid Date: Jul 23 2024
Huntsville, AL
Bid Date: Jan 23 2025
Alabaster, AL
Bid Date: Jul 30 2024
Birmingham, AL
--
Prattville, AL
Bid Date: Sep 05 2024
Dothan, AL
Bid Date: Aug 06 2024
Redstone Arsenal, AL
Bid Date: Jul 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
