Site work and new construction of a municipal facility in Innsbrook, Missouri. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

The Scope of Work includes a 2,500 SF wood construction building, including offices, council room, conference room, kitchenette, restrooms and sitework and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. Each bid shall be accompanied by a certified check or bank draft on a responsible solvent Missouri bank, or a satisfactory bid bond executed by the bidder and an acceptable Surety company, naming the Owner as Obligee, in the amount of not less than five percent (5%) of the Base bid plus the greatest of the Alternate bids ("Bid Security"). If the bidder fails to enter into a Contract with the Owner on the terms stated in his bid, or fails to furnish Performance and Payment Bonds as required by the Contract Documents, the amount of the Bid Security shall be forfeited to the Owner as liquidated damages, not as a penalty. The successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of the Contract, and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum as security for the payment of all persons performing labor on the project under this Contract and furnishing materials in connection with this Contract. The Surety shall be a company licensed to do business in the State of Missouri and shall be acceptable to the Owner. The Performance Bond and the Labor and Material Payment Bond may be in one or in separate instruments; however, if combined into one, the amount shall be for two hundred percent (200%) of the Contract Sum. The Village of Innsbrook anticipates issuing notice to proceed in August 2024. The work to be performed under this contract must be substantially completed in 240 days. Contractor shall pay, as liquidated damages, the sum of $500.00 per day after the date of substantial completion that the work on the City Hall has not been finally completed. The total amount so payable to the Owner as liquidated damages may be deducted from any sums due or to become due to Contractor from Owner. The Owner Intends to Award the Contract to the Most Responsive, Responsible Bidder Submitting the Lowest Bid. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner.

Post-Bid

Municipal

$860,000.00

Public - City

New Construction, Site Work

47

14

21

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
159
Bidding Soon
1,434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

August 7, 2024

Project location map

To Be Determined, Innsbrook, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.