Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Demolition, site work, paving and new construction of a civil project in Crystal Lake, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

20250211036. 6739-00-70 WISC 2025330 T Crystal Lake, Dover Avenue, Mecan River Bridge, B-39-0082, LOC STR Marquette County Work Summary: Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, Permanent Signing, Traffic Control, Restoration. Work Type: AF DBE Goal: 5% Working Day Contract: 45 Days Guaranty Required: $40,000.00 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Question Deadline 02/10/2025 at 11:45 AM CT, Any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. WI DOT - 036 - T Crystal Lake, Dover Avenue, Mecan River Bridge General. Perform the work under this construction contract for Project 6739-00-70, T Crystal Lake, Dover Avenue, Mecan River Bridge, B-39-0082, Marquette County, Wisconsin as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions. If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system. 100-005 (20240703) Scope of Work. The work under this contract shall consist of masonry bridges, steel piling, permanent steel sheet piling, removing old structure, bar steel, excavation, HMA pavement, base aggregate, heavy riprap, signing and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. 104-005 (20090901) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$719,212.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

56

5

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
5
Bidding Soon
1,275
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

Project location map

Dover Ave, Crystal Lake, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.