Site work for an educational facility in Sterling, Virginia. Design plans call for site work for a primary / secondary education facility.

The Park View High School project involves the construction of an estimated 309,000 square foot building along with numerous out buildings which will serve students in grades nine through twelve. The high school will include classrooms, cafeteria, auditorium, media center, gymnasium, an auxiliary gymnasium, outdoor physical education fields, and other associated spaces to support the high school program. The project involves the construction of the new school on the current stadium and athletic fields; upon completion of new facility, the existing school building will be razed and new outdoor athletic facilities will be constructed where the former school was sited. To facilitate the significant fill requirements and associated schedule impacts for the new school site, this project will be bid in two GMP’s with an early GMP to begin site work activities. GMP 2 – Building and Remaining Site Work 02A – Demolition and Abatement 03A – Building Concrete 04A – Masonry 05A – Steel 06A – General Trades 07A – Roofing 08A – Glass and Aluminum 09A – Drywall & Ceilings 09C – Athletic Flooring 09D – Carpet & Resilient Flooring 11A – Food Service Equipment 11B - Athletic Equipment 11C - Stage Equipment 12A – Millwork and Casework 12B - Telescoping Bleachers 12C - Auditorium Seating 13A - Grandstands and Bleachers 21A – Sprinkler 23A – Mechanical, Plumbing & Geothermal 26A – Electrical & Low Voltage 32D – Fences and Gates 32E – Landscaping, Seed, and Sod 32F – Playground Equipment & Surfacing 32G - Synthetic Turf & Sports Field Equipment As of September 9, 2024, a construction manager has been awarded and construction is expected to start with site work in October 2024. Subcontractor bidding will be released in separate packages, beginning in October 2024. Site work is let. The new school is anticipated to open in fall 2027 (2027-2028 school year) and the new outdoor athletic facilities complete by the start of the 2028-2029 school year. Construction start for GMP 2 is anticipated for January 2025. *Estimated value shown is for entire project including all bid packages.

Design

Educational

$90,000,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
79
Bidding Soon
1,928
All Active Projects
757
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

img_map_placeholder

400 W Laurel Ave, Sterling, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.