Site work and paving for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The consultant's construction estimated for this contract is: $1,756,700.00 The Deadline for questions is scheduled for July 23, 2024 at 4:00PM (CT). The City of San Antonio point of contact for this solicitation is Procurement Specialist II, Desiree Alderete, desiree.alderete@sanantonio.gov. It is understood and agreed that the work is to be substantially completed on or before 180 calendar days. This project does not include hazardous environmental work. This project requires 10 project signs. Project Duration: This task order contract shall be terminated one hundred and eighty (180) calendar days after the issuance of the first task order. The construction time (in calendar days) for each individual site will be negotiated between the City Engineer or Project Manager and the Contractor. The Contractor will be expected to begin construction for each individual site in accordance with Article 1- General Provisions, Section 1.2.4, Notice to Proceed and Commencement of Contract Times in the General Conditions-City of San Antonio Construction Contracts. Liquidated damages for construction time will be assessed on a per site basis should the contractor fail to complete the construction in the specified working days as negotiated by the City Engineer or Project Manager. The Contractor shall refer to section 4.3.6 of the general conditions for claims for additional contract time due to inclement weather. It is anticipated that some project sites may require working time restrictions. No additional cost will be paid to the contractor for reduced working times. Project Scope: Project construction may include but is not limited to: asphalt surface course replacement, base and pavement replacement, base reinforcement using geogrid, pothole repair, asphalt milling, striping and pavement markings removal and installation, adjusting existing valve boxes and manholes, and any other items required due to the site conditions to accomplish the project scope. Project Location: Project locations are not provided in this contract and could be spread throughout the city. Each project site will be issued as a separate Task Order and quantities will be provided to the Contractor.

Post-Bid

Roads / Highways

$1,756,700.00

Public - City

Paving, Site Work

62

5

2

8

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
38
Bidding Soon
2,013
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

October 15, 2024

img_map_placeholder

Multiple Locations, San Antonio, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.