Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 28, 2025 at 7:00 PM
Updated November 29, 2025
Site work and paving for a road / highway in Cavour, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Location of project :Ush 8 To Florence County Line Concept :Const/resurface Route : STH 139 Estimate Anticipated Funding $3,000,000 - $3,999,999 As of November 28 , 2025, the project is in Conceptual status. Anticipated letting date is 14/09/2027 WisDOT - Cavour - Brule River *Project information has been obtained through a public transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$3,999,999.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2028
wi -139, Cavour, WI
Related To This Project
Minong, WI
Bid Date: Sep 09 2025
Laona, WI
--
Saint Croix Falls, WI
--
Spooner, WI
--
Ingram, WI
--
Antigo, WI
--
Hayward, WI
--
Spooner, WI
--
Endeavor, WI
--
Spooner, WI
--
Three Lakes, WI
--
Minocqua, WI
--
Hudson, WI
--
Cashton, WI
--
Birchwood, WI
Bid Date: Aug 06 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
