BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2024 at 7:00 PM

Updated November 15, 2024

Site work for a water / sewer project in Garland, North Carolina. Completed plans call for site work for a water / sewer project.

Project construction will be let under the following Prime Contracts with construction including, but not limited to, the following major work items A. CONTRACT I, GENERAL WWTP IMPROVEMENTS 1. Contract I, consists of structural repair of the perimeter dikes for each lagoon, installing baffle curtain walls in each lagoon, installation of an influent bar screen, installation of a dual train chlorination contact chamber and a dechlorination system. a. DIKE STRUCTURAL REPAIRS 1) The perimeter dikes for each lagoon shall be restored to the elevations and slopes as shown on the plans. The damaged areas shall be assessed and prepared to ensure proper structural repairs are achieved, approved soil material shall be compacted in place and graded to the elevations shown. All drive areas shall be reestablished with like stone to the elevations shown on the plans. 2) Soil Test were sampled and the results are attached in the Appendix. All questions related to this bid shall be submitted in writing to bpopp@withersravenel.com prior to Wednesday, September 25th, 2024, at 5 pm to receive consideration. Contract I, General WWTP Improvements consists of structural repair of the perimeter dikes for three existing WWTP lagoons, installing baffle curtain walls in each lagoon, installation of an influent bar screen, installation of a dual train chlorination contact chamber and a dechlorination system. Contract II, WWTP Sludge Removal consists of furnishing environmental biosolids removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing, or other incidental work for one time removal of accumulated wastewater biosolids from the existing wastewater treatment lagoons at the Town of Garland Wastewater Treatment Plant. Supplier shall provide the services of a factory-trained representative to check the installation and to start up each Chain & Rake System and controller. The factory representative shall have complete knowledge of proper installation, operation, and maintenance of equipment supplied. Representative shall inspect the final installation and supervise a start-up test of the equipment. Question Deadline 11/07/2024 at 5:00 PM ET change from 09/25/2024 at 5:00 PM ET All questions related to this bid shall be submitted in writing to bpopp@withersravenel.com prior to to receive consideration. EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% State of NC MBE/WBE participation goal: 10% (combined)

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Site Work

26

25

16

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
105
Bidding Soon
1,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

January 13, 2025

Project location map

1085 Harrells Hwy, Garland, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.