EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 2, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Tenders are invited to furnish all necessary labor, supervision, tools, equipment, materials and appurtenances, including transportation, to remove and replace a combined quantity of approximately 17,800 square yards of either asphalt or concrete roadway pavement at the Stickney Water Reclamation Plant (WRP), 6001 West Pershing Road, Cicero, IL 60804; the Calumet WRP, 400 East 130th Street, Chicago IL, 60628; the Egan WRP, 550 S. Meacham Road, Schaumburg, IL 60193, and at the Lawndale Avenue Solids Management Area (LASMA), 7430 West Portage Trail, Forest View, IL 60402, over an approximate thirteen (13) month period, commencing on or about September 9, 2024, or upon approval of the Contractor's Bond whichever occurs later. The estimated cost of the work under this Contract is as follows: Group A - Stickney Water Reclamation Plant (SWRP): $ 158,000.00 Group B - Egan Water Reclamation Plant (EWRP): $ 400,000.00 Group C - Calumet Water Reclamation Plant (CWRP): $ 689,000.00 Group D - Lawndale Avenue Solids Management Area (LASMA): $ 303,000.00 Total for All Groups: $1,550,000.00 The Contractor shall furnish all necessary labor, supervision, tools, equipment, materials and appurtenances, including transportation, to remove and replace a combined quantity of approximately 17,800 square yards of either asphalt or concrete roadway pavement at the above locations, per specifications attached hereto, over an approximate thirteen (13) month period, commencing on or about September 9, 2024, or upon approval of the Contractor's Bond whichever occurs later, and terminate thirteen months thereafter. A more detailed description of the work is given in the Detail Specifications attached hereto. The public cannot attend but can view the bid opening at electronically. There is No Bid Depository Safe Available for Mailing or Hand Delivering Bids. Bids Will Be Deemed Non-responsive if Not Submitted electronically. Any questions regarding the obtaining of the Contract Document should be directed to the following email: contractdesk@mwrd.org or call 312-751-6643. The contact person for this Contract is Mr. Raphael Frost. Mr. Frost will provide online responses to online inquiries. Each Bidder must submit with their proposals a signed and completed MBE/WBE Utilization Plan which lists each business intended to be used as an MBE and WBE on pages UP-2 and UP-3 and supplemental pages as necessary. The Bidder must sign the Signature Section page on UP-4. Failure to submit a signed MBE/WBE Utilization Plan will result in a bid being deemed non-responsive and the bid will be rejected. Also, if a Waiver is sought, the Bidder is required to sign pages UP-4 and UP-5, which are the Signature Section and the Waiver Request Form; failure to do so will be viewed as nonresponsive and the bid will be rejected. Each Bidder must submit with their bid package an original or facsimile copy of the MBE/WBE Subcontractor's Letter of Intent, page UP-6 for each subcontractor listed on their MBE/WBE Utilization Plan. If the Bidder lists itself on the MBE/WBE Utilization Plan, an MBE/WBE Subcontractor's Letter of Intent from the Bidder to itself must be included. The submitted MBE/WBE Subcontractor's Letter of Intent must be completed and signed by the subcontractor and accompanied with a copy of the subcontractor's current Letter of Certification from a state, local government or agency or documentation demonstrating that the subcontractor is a MBE or WBE within the meaning of the Affirmative Action Ordinance, Revised Appendix D. Failure to submit the MBE/WBE Utilization Plan signed by the Bidder at the time of the bid opening and the MBE/WBE Subcontractor's Letter of Intent signed by each MBE and WBE will be viewed as nonresponsive and the bid will be rejected. The work under this Contract is classified as "Road Construction" for the Minority-owned Business Enterprises (MBE) and Women-owned Business Enterprises (WBE) Utilization goals contained in the Affirmative Action Ordinance Revised Appendix D. The associated utilization goals for each Group under this Contract are 20% MBE, 10% WBE and 3% VBE. Should you have any questions, please contact the Diversity Office at 312-751-4035. The purpose of the Voluntary Technical Pre-Bid Conference is to review the scope of work, to provide for identification and discussion of potential problems that might arise during the administration of this Contract, and to seek clarification of technical or procedural aspects of this Contract. There will be a Q&A session at the end of the meeting. Also, Bidders must give their contact information in order to register for the conference, prior to entering the Zoom Pre-Bid meeting. Bidders are STRONGLY URGED to inspect all areas of the work sites prior to bidding, in order to familiarize themselves with the nature of the work and the method of accomplishing the same. The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals.

Bid Results

Roads / Highways

$178,175.00

Public - County

Paving, Site Work

15

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
130
Bidding Soon
2,330
All Active Projects
1,047
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Chicago, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Remove and Replace Pavement At Various Locations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.