BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Neligh, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Nebraska Game and Parks Commission reserve the right to accept or reject any or all Bids and to waive any or all informalities or irregularities The Independent Contractor is responsible for compliance with all laws, ordinances, orders, and rules and regulations but not limited to, obtaining any necessary permits, licenses, and inspections. The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics In accordance with Neb. Rev. Stat. ß 72-803 (4), bidder's proposal shall be submitted on a form supplied with the Bidding Documents and must be accompanied by a certified check, cashier's check, or Bid Bond in the amount of 5% of the total Bid, made payable to the Nebraska Game and Parks Commission as Bid security The Bidder shall furnish the required 100% Performance and 100% Labor and Material Payment Bonds to the Commission not later than the date of execution of the Contract The left bank of the Elkhorn River will be stabilized to repair damage caused by the 2019 flood. Approximately 980 cubic yards (CY) of type “B” riprap will be placed along 295-feet of the bank. The riprap will be placed on filter fabric, and all riprap placed above the ordinary high watermark (OHWM) will be covered with 6-inches of topsoil and seeded. Total permanent impacts from the stabilization activities include 0.028-acre of PSSA riverine channel wetlands and 0.078-acres (295 linear feet) of channel below the OHWM.

Bid Results

Roads / Highways

$170,992.00

Public - State/Provincial

Paving, Site Work

13

8

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
89
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 30, 2024

img_map_placeholder

Cowboy Trail, Neligh, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.