BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Vernon, Texas. Completed plans call for site work for a water / sewer project.

A. Work of the project generally consists of the installation of approximately 32,500 LF of water line, including boring under a Burlington Northern Santa Fe Railroad, connection to existing raw water supply line, and connecting to existing nitrate removal plant supply line. B. Perform Work of Contract under unit price contract with Owner in accordance with Conditions of the Contract. C. Drawings cover Work of the Contract. Question Deadline 08/08/2024 Please submit questions for this project at least 5 business days prior to bid opening through Online in the Q&A portal or to David Perkins, P.E. at david.perkins@kimley-horn.com Install approximately 32,500 LF of 24 water line, including boring under a Burlington Northern Santa Fe Railroad, connecting to an existing raw water supply line, and connecting to an existing nitrate removal plant supply line. 24" Raw Water Line Bid Results :: Bid Schedule 1.00 :: Sky Blue Utilities :: $ 6,745,853.04 Bid Schedule 2.00 :: Ella SA Contracting :: $ 2,375,674.26

Bid Results

Water / Sewer

$9,121,527.00

Public - City

Site Work

62

16

4

5

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
9
Bidding Soon
97
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

img_map_placeholder

To Be Determined, Vernon, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.