Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2024 at 8:00 PM

Updated May 1, 2025

Site work for a bridge / tunnel in Bonnyville, Alberta. Completed plans call for site work for a bridge / tunnel.

Project involves is to supply and install a 3,670 mm diameter SPCSP culvert, 40.23 m invert length, by open cut method, removal and dispose of existing 2019 mm span x 2226 mm rise culvert, traffic accommodation, heavy rock riprap, and erosion control measurements.

Award

Bridges / Tunnels

$886,272.00

Public - County

Site Work

10

6

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
4
Bidding Soon
71
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

September 23, 2024

Project location map

SW 2-63- 7 W4M, Bonnyville, AB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed