Renovation of an educational facility in Gary, Indiana. Completed plans call for the renovation of a educational facility.

Office of the Vice President for Capital Planning and Facilities In accordance with Indiana Code 4-13-18 Drug Testing of Employees of Public Works Contractors and IC 5-16 Public Works Bids received after that time will not be accepted. All questions and requests for substitutions should be submitted by 12:00 pm EDST, Wednesday, July 24th, 2024. A Unified Bid is requested for all work in this project, including General, Mechanical, and Electrical Construction work. Each bid must be accompanied by: o a completed Minority, Women's and Veteran's Business Enterprise Participation Plan, detailing the good faith efforts of the contractor to include minority, women and veteran- owned enterprises as subcontractors or material suppliers on the Project; o a bid security for 5% of the total bid; and o the contractor's written drug testing program, which must be in full compliance with IC 4- 13-18. The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Women's and Veteran's Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Should a successful Bidder withdraw his bid or fail to execute a satisfactory Contract within 10 days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty.

Bid Results

Educational

$570,724.00

Public - State/Provincial

Renovation

23

17

13

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Heating, Cooling, and Ventilating, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Wheelchair Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
76
Bidding Soon
1,788
All Active Projects
736
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

October 21, 2024

img_map_placeholder

3400 Broadway, Gary, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Raintree Hall Phase 1 - Install New Central Ahu

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.