BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Site work and paving for a road / highway in Dubuque, Iowa. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update:Funding for this project entitled "Building Bridges to Employment and Equity (B2E2)" will provide for the planning, design, and construction of a multimodal transportation corridor project for proposed improvements to the Elm Street corridor, the 16th Street corridor, the Kerper Blvd. corridor, Chaplain Schmitt Island corridor, and the proposed 14th Street Railroad (vehicular and pedestrian) Overpass bridge project. The improved multimodal transportation corridors will connect vulnerable neighborhoods and low income residents with economic opportunities, recreational amenities and key community resources in the Kerper Boulevard Industrial Park, on Chaplain Schmitt Island, in downtown Dubuque and its Historic Millwork District, and on the west side of the city via the downtown Intermodal Transportation Center. The proposed project will provide for the elimination of an existing at-grade rail crossing conflict on 14th Street and will provide for the planning and design a proposed vehicular and pedestrian overpass bridge which will connect downtown residents to job opportunities while avoiding train crossing delays that negatively impact the safe and efficient movement of people and goods to and from the Kerper Boulevard Industrial Park and Chaplain Schmitt Island. The project will also focus on multimodal transportation corridors with "complete streets" and proposed roundabout intersections along Elm Street and 16th Street corridors. The project would also include the design of an improved pedestrian/bike shared use path along Kerper Blvd and adjacent to the existing 16th Street Peosta Channel bridge to Chaplain Schmitt Island and strategically plan a roundabout at Captain Sheehy Drive on Chaplain Schmitt Island. Project is included in City of Dubuque Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Funding for this project entitled "Building Bridges to Employment and Equity (B2E2)" will provide for the planning, design, and construction of a multimodal transportation corridor project for proposed improvements to the Elm Street corridor, the 16th Street corridor, the Kerper Blvd. corridor, Chaplain Schmitt Island corridor, and the proposed 14th Street Railroad (vehicular and pedestrian) Overpass bridge project. The improved multimodal transportation corridors will connect vulnerable neighborhoods and low income residents with economic opportunities, recreational amenities and key community resources in the Kerper Boulevard Industrial Park, on Chaplain Schmitt Island, in downtown Dubuque and its Historic Millwork District, and on the west side of the city via the downtown Intermodal Transportation Center. The proposed project will provide for the elimination of an existing at-grade rail crossing conflict on 14th Street and will provide for the planning and design a proposed vehicular and pedestrian overpass bridge which will connect downtown residents to job opportunities while avoiding train crossing delays that negatively impact the safe and efficient movement of people and goods to and from the Kerper Boulevard Industrial Park and Chaplain Schmitt Island. The project will also focus on multimodal transportation corridors with "complete streets" and proposed roundabout intersections along Elm Street and 16th Street corridors. The project would also include the design of an improved pedestrian/bike shared use path along Kerper Blvd and adjacent to the existing 16th Street Peosta Channel bridge to Chaplain Schmitt Island and strategically plan a roundabout at Captain Sheehy Drive on Chaplain Schmitt Island. This project is included in the city's fy 2025-2028 Capital Improvement Program. As of July 2, 2025, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$3,400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
94
Bidding Soon
1,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.