BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a mixed-use development in Val-d'Or, Quebec. Completed plans call for the renovation of a municipal facility; and residential development.

Reference number: 20007815 The Kitcisakik Anicinapek Council, owner, is requesting bids for the installation of electrical entrances and related work, for all community buildings located in Kitcisakik, Quebec (near KM 426, route 117). The aim of the project is to prepare the buildings for supply from Hydro-Québec's new distribution network, which will be deployed in the village in the coming months. Details of the work can be found in the attached plans and specifications. The scope of work, depending on the building, ranges from the simple installation of a 240-volt meter socket in the existing distribution system, to the installation of a complete new 600-volt electrical input distribution system and conversion of the building's existing 240-volt distribution system, including the construction of electrical rooms required for the installation of the new equipment. The project will be divided into two main phases. The first phase will involve building extensions and the installation of new equipment, making it possible for Hydro-Québec to supply power to the buildings. The second phase will involve coordination with Hydro-Québec of all connections and the conversion of certain equipment, which can only be carried out at the time of H.Q. connection (e.g. replacing a 120/240 1ph panel with a 120/208 3ph panel). Work can begin as soon as the contractor is awarded the contract in 2024. The first phase should be completed by the end of 2025. The second phase can then be carried out once the Hydro-Québec network has been installed, i.e. in early 2026 and the following months. The timing of the second phase will depend on Hydro-Québec's progress with the project.

Post-Bid

Municipal

$500,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
66
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

img_map_placeholder

Multiple Locations, Val-d'Or, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.