BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Raymond, New Hampshire. Conceptual plans call for the renovation of a water / sewer project.

As of August 28, 2024, project was abandoned, project is no longer needed. The Town of Raymond hereinafter, "Town" is a municipal corporation in the State of New Hampshire, in the County of Rockingham, with an official place of business of Town Office, 4 Epping Street, Raymond, NH 03077. It is the intent of the Town to enter into an agreement, through its Director of Public Works, with the selected contractor for the replacement of the master control panel at the water treatment plant located at 5 Cider Ferry Rd Raymond NH 03077. The Town is also looking to replace the treatment plant office computer and upgrade the Sun Hill Booster Station located on Sun Hill Rd. in Raymond NH 03077 so it can be added to the current SCADA System. SCOPE OF WORK : a. The contractor will coordinate with the Water Foreman to schedule a time frame to start the project. b. The contractor will replace the master control panel with materials from the products list in a manner that will allow the treatment plant to always stay operational throughout the project. If the treatment plant needs to be shut down at any time, the contractor will check with the Water Foreman to make sure it is safe to do so. The master control panel will be designed so that all wiring, surge equipment or loose equipment inside the panel are neatly organized and clearly marked. The electrical conduit outside the panel will be constructed so that any condensation will drain to the outside of the panel enclosure. The contractor will add the Sun Hill Booster Station and its functions to the overview screen on the new computer. The contractor will test the panel when completed to make sure that all functions are working correctly. The contractor will train the water staff how to use the master control panel when the project is complete. c. The contractor will replace the treatment plant office computer, printer and auto dialer with battery backup from the products list and transfer all functions from the old computer to the new computer including upgrades. The contractor will test that all functions and alarms are working correctly. The contractor will ensure that the computer is updated with cyber security software to protect the treatment plant from possible cyber-attacks. The contractor will train the water staff how to navigate and operate the new computer. d. The contractor will make sure that surge protection is in place for all scopes of the project. e. The contractor will upgrade the Sun Hill Booster Station with the equipment needed from the products list to allow the building to be monitored and operated through the current SCADA system at the water treatment plant. Surge protection will also be installed on all the equipment in the building. The contractor will train the water staff in how the new equipment works. Anticipated work would begin during the summer/fall months of 2024. All work to be completed by November 29, 2024. Work hours will be from 7:30 am to 4:00 pm Monday through Friday. No holidays or weekends allowed. Work hour exceptions will be made if there is an issue that justifies the changes. No bid or performance bonding is required. The Director of Public Works reserves the right to waive any informalities or minor defects in the Bid and/or reject any and/or all Bids, for whatever reason is determined to be in the best interest of the Town of Raymond.

Project Abandoned

Water / Sewer

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
481
Active Projects
276
Bidding Soon
3,807
All Active Projects
1,481
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2024

August 29, 2024

November 29, 2024

img_map_placeholder

Multiple Locations, Raymond, NH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.