Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 30, 2024 at 8:00 PM
Updated March 12, 2025
Site work for a water / sewer project in Seguin, Texas. Completed plans call for site work for a water / sewer project.
**As of August 26, 2024 this project has not yet been awarded. A timeline for award has not yet been established. The City anticipates the following items will be included in the scope of the Project: installation of approximately 3,200 LF of 8-inch PVC water line, 5,250 LF of 12-inch PVC water line, 30 LF of 16-inch PVC water line and 4,600 LF of 24-inch PVC water line, site preparation; excavation; groundwater controls, SWPPP, borings at specified locations; and all other appurtenances necessary for the complete Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. Each bid must be accompanied by a certified or cashier's check, or an approved bidders bond in an amount not less than 5% of the maximum total proposal, payable to the City of Seguin, Texas without recourse, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds on the forms provided, within ten (10) days after the award of contract. The successful Bidder must furnish Performance and Payments Bonds each in the amount of 100% of the contract price from an approved Surety Company holding a permit from the State of Texas to act as Surety and acceptable according to the latest list of companies holding certificates of authority from the Secretary of Treasury of the United States, or other Surety or Sureties acceptable to the Owner. The City of Seguin reserves the right to reject any or all bids and to waive informalities. No bid may be withdrawn within ninety (90) days after the date on which bids are received Question Deadline 08/02/2024 at 4:00 PM CT Please submit questions for this project through electronically. All addenda issued for this project will be posted electronically. It is the responsibility of the Contractor bidding to use proper scaling, paper size, etc., for bid quantities. Failure to do so may result in error in the Unit Bid Quantities and/or Proposal Amounts.
Bid Results
Water / Sewer
$5,150,450.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
