BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work for a transportation facility in Stratford, Connecticut. Completed plans call for site work for a transportation facility.

State Project Number(s) & Description: State Project No. 0301-0536-R1; Track Improvement Mobility Enhancement 1 - Contract A in Bridgeport & Stratford Required Prequalification Work Classification(s): 22 - Railroad Construction Electrical Federal-aid Project Number(s) & Funding Source: FTA (F.A.P. No. TBD) and State Project Scope Code: P - $ 120,000,000 $ 159,999,999 District Number(s): 5 - New Haven Contract DBE % Goal or SBE % Set-Aside: 7% DBE Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Departments (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid Question Deadline 12/15/2025 at 9:00 AM ET - Pre-bid Questions and Answers: Questions Pertaining to Dot Advertised Construction Projects Must Be Presented Through the Ctdot Pre-bid Q and a Website. the Department Cannot Guarantee That All Questions Will Be Answered Prior to the Bid Date. At this time Project(S) Being Bid Will Be Closed for Questions, at Which Time Questions Can No Longer Be Submitted Through the Q and a Website. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. CTDOT - Track Improvement Mobility Enhancement 1 - Contract A in Bridgeport & Stratford *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - 0301-0536-R1

Bid Results

Transportation Terminals

$177,911,504.00

Public - State/Provincial

Site Work

941

9

376

10

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
998
Active Projects
513
Bidding Soon
5,856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

February 16, 2026

Project location map

Multiple Locations, Stratford, CT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.