BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2024 at 7:00 PM

Updated November 21, 2024

Demolition, site work, renovation and addition to a mixed-use development in Burleson, Texas. Completed plans call for the renovation of a fire / police facility; and for the addition of a municipal facility.

The City of Burleson is requesting Competitive Sealed Proposals (RFCSP) with the intent of awarding a contract for a General Contractor to complete a renovation and addition of the City of Burleson Fire Station #1 located at 828 SW Alsbury Boulevard, Burleson, Texas, 76028. Questions Due Date: Oct 4th 2024, 5:00 PM CDT SCOPE OF WORK A. The controls contractor shall furnish and install a complete building automation system including all necessary hardware and all operating and applications software necessary to perform the control sequences of operation as called for in this specification. Network level components of the system - workstations, servers, etc. shall communicate using the BACnet protocol, as defined by ASHRAE Standard 135-2004, or EIA standard 709.1. No gateways shall be used for communication to controllers furnished under this section. At a minimum, provide controls for the following: 1. Direct Expansion Rooftop Units 2. Exhaust air fans 3. Terminal Units. 4. Monitoring points for packaged equipment such as emergency generators, walk-in coolers, and water detection etc. 5. Power wiring to DDC devices, smoke control dampers, and BAS panels except as otherwise specified. B. Except as otherwise noted, the control system shall consist of all necessary Ethernet Network Controllers, Standalone Digital Control Units, Room Controllers, workstations, software, sensors, transducers, relays, valves, dampers, damper operators, control panels, and other accessory equipment, along with a complete system of electrical interlocking wiring to fill the intent of the specification and provide for a complete and operable system. Except as otherwise specified, provide operators for equipment such as dampers if the equipment manufacturer does not provide these. Coordinate requirements with the various Contractors. C. The BAS contractor shall review and study all HVAC drawings and the entire specification to familiarize themselves with the equipment and system operation and to verify the quantities and types of dampers, operators, alarms, etc. to be provided.

Award

Fire / Police

$4,350,861.00

Public - City

Addition, Demolition, Renovation, Site Work

157

44

91

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
197
Bidding Soon
3,752
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

December 10, 2024

Project location map

828 SW Alsbury Blvd, Burleson, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.