Renovation of a transportation facility in Denver, Colorado. Completed plans call for the renovation of a transportation facility.

Reference Number : 0000355895 The project consists of flooring replacement. The carpet in the general circulation areas within the concourses, gate hold rooms, and various Federal Inspection Service (FIS) areas has deteriorated significantly. This existing carpet has exceeded its expected lifespan and urgently requires replacement. The building expansion joint covers at the transitions from sub-cores to hold rooms throughout ACON, BCON, and CCON are damaged beyond repair and can no longer be repaired or secured in place. Carpet replacement in the concourses was last undertaken in 2016, with a six-year projected lifespan. The carpeting in these areas has now exceeded this lifespan, displaying noticeable signs of aging, extensive wear patterns, and stains beyond cleaning. Damaged building expansion joint covers and aged and deteriorated carpet create trip hazards for our customers, tenants, and employees. Additionally, floor renovation work has been recently conducted by United for their Gate of the Future project. For any work that conflicts with this project, coordination will take place to ensure deconflicting scopes are managed. The recommended solution is to replace all the flooring and expansion joint covers in the general circulation areas mentioned above. Additionally, areas around escalators and moving walkways with high traffic in the main circulation corridors on the concourses will replace the existing carpet with alternative flooring options. The alternative flooring option of installing terrazzo/quartz tiles for the main circulation areas of the concourses would align with the Great Hall and Concourse Expansion flooring options. Each Proposer must be prequalified in Category 2B.General Building at or above the $50,000,000.00 monetary level in accordance with the City's Rules and Regulations Governing Prequalification of Contractors. Each Proposer must have submitted a prequalification application a minimum of ten (10) calendar days prior to the response due date General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Contractors License Required - Employee Background Checks Required - Installation Required - Insurance Required - License Required - Prevailing Wage Required - Security Badges - Bid Bond 5 % - Performance Bond 100 % Question Deadline 10/10/2024 at 12:00 PM MT Questions are submitted online : Yes . - Payment Bond 100 % SCOPE OF WORK 1.0 Project Introduction 1.1 Project Name: ACON BCON CCON Flooring Replacement 1.2 Scope: The Design-Build Contractor (DBC) shall perform the work of this Request for Proposal (RFP) as described below. All Architectural-Engineer (A-E) Services required in this RFP shall be performed by licensed Architects and Engineers registered in the State of Colorado. 1.3 Location: This project is located at Denver International Airport, 8500 Pena Blvd., Denver, CO 80249. 1.4 Background: DEN is seeking a Design-Build Contractor to complete the design and replacement of existing flooring and flooring components in various areas within the Terminal Complex, predominantly on all three concourses. The carpet in the general circulation areas within the concourses, gate hold rooms, and various Federal Inspection Service (FIS) areas has deteriorated significantly. This existing carpet has exceeded its expected lifespan and requires replacement. The building expansion joint covers at the transitions from sub-cores to hold rooms throughout ACON, BCON, and CCON are damaged beyond repair and can no longer be repaired or secured in place. Carpet replacement in the concourses was last undertaken in 2016, with a six-year projected lifespan. The carpeting in these areas has now exceeded this lifespan, displaying noticeable signs of aging, extensive wear patterns, and stains beyond cleaning. Damaged building expansion joint covers and aged and deteriorated carpet create trip hazards for our customers, tenants, and employees. Additionally, floor renovation work has been recently conducted by United for their Gate of the Future project. For any work that conflicts with this project, coordination will take place to ensure deconflicting scopes are managed. The recommended solution is to replace all the flooring and expansion joint covers in the general circulation areas mentioned above. Additionally, areas around escalators and moving walkways with high traffic in the main circulation corridors on the concourses will replace the existing carpet with terrazzo for the main circulation areas of the concourses. 2.0 Project Requirements 2.1 The scope of this project will include, but is not limited to, the following: Submit DB Design Development and DB Construction Documents per DEN Design Standards for review and approval to: Removal of post-removal management of existing carpet. Based on the significant amount of carpet to be removed from the project area, DEN expects the proposers to consider effective and innovative means of recycling, reusing, or upcycling the existing carpet. This represents an opportunity for the proposing team to showcase value-adds to DEN through returning the removed carpet to the airport in a second-life capacity or product. Where any existing flooring is removed, treat the subfloor to include floor leveling, crack suppression membrane where needed, and include replacing all existing building expansion joint covers within the defined scope of work area. Furnish and install materials in accordance with all transmitted plans, specifications, and manufacturer-recommended instructions. Pricing will include the removal and reinstallation of furniture, podiums, cabinetry, and other fixtures located on the floor in the work area. Complete the existing conditions survey. Finish options for Carpet and Terrazzo will be provided by the contractor to the Design Review Committee for approval in accordance with the performance specifications in attachments. Provide a schedule for the given scope of work in 700 calendar days. This will be a phased night shift replacement. Night shift work windows will be coordinated with respective airlines in the areas of work. For planning purposes, the work windows will be 10 pm - 5 am. Provide an add alternate for the scope in Add Alt Scope Drawings, this should include both the Schedule and Cost implications of this alternate. For planning and proposal purposes, use the following quantities. Base Scope: Carpet Area- 341,000 SF Terrazzo Area- 168,000 SF Add Alternate Scope: Carpet Area- 120,000 SF Construct the project according to the accepted base bid and any accepted add alternates. Complete as-built survey. Provide as-built drawings and digital deliverables per DEN Design Standards. Use the cost proposal worksheet to provide pricing, assuming $25,000,000 as the total project cost.

Bid Results

Transportation Terminals

$25,000.00

Public - City

Renovation

28

14

20

11

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
989
All Active Projects
413
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

November 21, 2024

img_map_placeholder

8500 Peña Blvd, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.