BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Royal Oak, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number: 0000357758 The work shall consist of furnishing all labor, materials, equipment, and incidental items but is not limited to the following major items of work: Resin Impregnated Felt Lining of 8" through 24" Diameter Sewer - 6,690 LF In addition, the work includes internal cutting of protruding service connections prior to lining as stipulated in the project specifications or as determined by the engineer. All work shall be performed using proven trenchless processes which do not require open-cut excavations. Open-cut excavations shall only be performed when approved in writing by the engineer, if the City determines that the work cannot be performed by remote internal type equipment. The location of the work specified under this contract is as shown on the cover sheet of the plans and as listed in Table 1 on pages PS 11 and PS 12 of the project specifications. The City reserves the right to make modifications to the locations of the work. Each sewer run to be lined shall be thoroughly cleaned and internally televised and video recorded prior to lining. At least three (3) days prior to lining a sewer run, one (1) copy of the pre-lining television inspection report and one (1) copy of the pre-lining video stored and saved in USB flash drive or in any approved digital data storage device, must be furnished to the engineer. The pre-lining television inspection report shall clearly indicate the existing pipe diameter and the total number of active service connections within the sewer run. The report shall serve as field verification by the contractor and city inspector of the existing pipe diameter and total number of active service connections. The contractor shall perform dye testing of lateral service connections if needed or as directed by the engineer to verify live or active service connections. Dye testing shall be performed in conjunction with the pre-lining television inspection work. Dye testing operation will not be paid separately, but the cost associated with the work shall be considered included in the sewer lining items of the contract. It is presently estimated that no more than ten (10) service connections are needed for dye testing to verify service connection's status. Question Deadline 07/26/2024 at 2:00 PM ET Questions are submitted online: No Questions are submitted online: No Please contact Leah Motyka at leahm@romi.gov or 248-246-3034 with any questions - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 5 % - Labor and Materials Bond 100 % General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - Installation Required - Insurance Required Each proposal must be accompanied by a certified check or bid bond by a recognized surety company in the amount of 5 percent (5%) of the bid payable to the City of Royal Oak as security for the acceptance of the contract. No bidder may withdraw his proposal between the date set for the opening thereof and the date upon which the contract is awarded. The City reserves the right to reject any or all proposals and the right to waive defects in proposals.

Bid Results

Water / Sewer

$550,596.00

Public - City

Site Work

7

5

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
109
Bidding Soon
1,522
All Active Projects
629
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.