BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Mansfield, Massachusetts. Completed plans call for the renovation of a water / sewer project.

It is the intent of this specification to accurately describe the work to be performed to renovate the sand bed filter system at the Wading River Treatment Plant. Rehabilitation of the West filter bed at the Wading River Treatment Plant. This project is solely for the removal and disposal of the existing course sand top 2" layer of the West filter bed. Plant is located at 250 Balcom Street, Mansfield, MA 02048. The existing West Sand filter occupies 2.3 acres (approximately 630 cubic yards). Construction must be completed by September 31, 2024. Work shall take no longer than 10 business days. The successful Contractor will be required to submit a Labor and Materials Payment Bond in the amount of fifty percent (50%) of the contract amount IF contract amount is greater than $25,000.00. Payment bond will be held in the City's Purchasing Office until all work has been accepted by the City. This bond shall be renewable on a yearly basis if this contract is extended due to a contract extension provision. Questions regarding the specifications should be directed to Greg O'Brien, Assistant Superintendent of Water at (774) 203-1854 or water4@cityofattleboro.us. Questions regarding the RFQ may be directed to Carol Brown, Purchasing Assistant, (508) 223-2222 ext. 3262, purchasing@cityofattleboro.us. The City reserves the right to make award, in one or more contracts, by item or items, or by total, as may be in the best interest of the City, to the lowest responsible and responsive contractor/company. A written Notice of Award (NOA) mailed or furnished to the successful contractor/company followed by a city Purchase Order shall be deemed to result in a binding contract without further action by either party. The award of any contract shall be subject to appropriation by Municipal Council. Work is expected to begin upon the "Notice to Proceed" by the Superintendent of Water.

Bid Results

Water / Sewer

$30,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
157
Bidding Soon
2,826
All Active Projects
1,172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 30, 2024

img_map_placeholder

250 Balcom St, Mansfield, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.