Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2025 at 8:00 PM
Updated September 21, 2025
Site work and paving for a mixed-use development in Sunnyslope, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Improve intersection geometry with a roundabout, install luminaires, ensure pedestrian facilities meet ADA, improve drainage, and provide other safety improvements. County: Chelan Agency: Chelan Co. Total Project Length : 0.120 Begin Termini : MP 5.08 End Termini : MP5.20 As of September 20 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. WADOT - Easy St and School St Intersection *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as become available.
Conceptual
Roads / Highways
$2,741,217.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
Easy St & School St, Sunnyslope, WA
Related To This Project
Sunnyslope, WA
Bid Date: Apr 11 2024
Sunnyslope, WA
Bid Date: Dec 14 2021
Sunnyslope, WA
Bid Date: Apr 26 2022
Manson, WA
--
Chelan, WA
--
Wenatchee, WA
--
East Wenatchee, WA
--
Wenatchee, WA
--
Waterville, WA
--
Orondo, WA
--
Wenatchee, WA
--
Douglas, WA
--
Wenatchee, WA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
