BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Bozeman, Montana. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

Gallatin County expressly reserves the right, in its sole judgment, to accept or reject any or all bids, with or without cause, and to waive any defects and to allow modifications and supplementation of bids that are submitted within the deadline. The project consists of the installation of approximately 1,840 LF of canal lining along the existing Highline Canal for the Highline Canal Company. Construction will include grading and shaping of the existing canal, installation of liner and ballast material, and required erosion control measures. The project includes an additive alternate to replace an existing culvert under the canal. Construction must be substantially completed by March 15, 2025, with final completion occurring no later than April 15, 2025. If the project is not completed within the time provided by this Agreement, the County may deduct for each day the Project remains uncompleted the sum of five hundred dollars ($500.00) from the compensation hereinafter specified and retain that sum as payment for liquidated damages sustained by reason of the Contractor's failure to complete the project on time. Bid question deadline August 12, 2024 at 3:00 PM MDT Requests for additional information or clarification, contact: Matt Selvig (WWC Engineering) at mselvig@wwcengineering.com If required, supply an original bid bond equal to 10% of total contract price.

Award

Water / Sewer

$226,235.00

Public - County

Site Work

30

34

4

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
71
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

September 18, 2024

img_map_placeholder

Multiple Locations, Bozeman, MT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.