Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Fairfield, Connecticut. Contact the soliciting agency for additional information.
The bidder declares that the scope of the work has been thoroughly reviewed and any questions resolved (see above for name and number of individual to contact for questions). If applicable, the bidder further declares that the site has been inspected as called for in the specifications (q.v.). AFTER REVIEW OF ALL FACTORS, TERMS AND CONDITIONS, INCLUDING PRICE, THE PURCHASING AUTHORITY OF THE TOWN OF FAIRFIELD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, OR ANY PART THEREOF, OR WAIVE DEFECTS IN SAME, OR ACCEPT ANY PROPOSAL DEEMED TO BE IN THE BEST INTEREST OF THE TOWN OF FAIRFIELD. The Town of Fairfield shall put forth its best effort to make payment within thirty days (30) after delivery of the item acceptance of the work, or receipt of a properly completed invoice, whichever is later. Payment period shall be net thirty days (30) unless otherwise mutually agreed upon. For projects that do not require a performance or bid bond, the Town of Fairfield reserves the right to retain five percent (5%) of total bid amount, which is payable ninety (90) days after final payment or acceptance of the work. If the work to be done under this Contract shall be abandoned, or if at any time the Town is of the opinion that the Contractor is willfully violating any of the conditions of this contract or is not executing said contract in good faith or that the work is unnecessarily delayed and will not be finished within the prescribed time, the Town may notify the Contractor and Surety, in writing to that effect. If the Contractor does not, within five (5) business days thereafter, take such measures as will, in the judgment of the Town, ensure the satisfactory completion of the work aforesaid, the Town shall have the power to notify the Contractor to discontinue all work or any portion thereof, under this contract. A copy of this contract shall go to the surety. Thereupon the Contractor shall cease to continue said work, on such part thereof as the Town shall designate. The Town shall thereupon have the power to place such and so many persons as deemed proper, by contract or otherwise, to work at and complete the work herein described and to use such materials, tools, and appliances found upon the work or to procure other materials, tools, and appliances for the completion of the same and charge the expenses of said labor, materials, tools, and appliances to the Contractor; and the expense so charged shall be deducted and paid by the Town out of such money as may be then due, or may at any time thereafter grow due to the Contractor under and by virtue of this agreement, or any part thereof; and in case the expense so charged is less than the sum which would have been payable under this contract if the same had been completed by the Contractor, the Contractor shall be entitled to receive the difference; and in case greater, the Contractor shall pay amount of such excess so due. Equipment, materials, and, or work executed shall be guaranteed for a minimum period of one (1) year against defective material and workmanship. The cost of all labor, materials, shipping charges, and other expenses in conjunction with the replacement of defective equipment, and, or unsatisfactory work, shall be borne by the Contractor. The Contractor shall upon written notice remedy any and all defects in materials or workmanship resulting from work done under this contract and repair any damage to any structures or property caused by the Contractor incidental to this work, all such repairs to be done in accordance with instructions furnished by the Town and/or Fairfield Public Schools, and paid for by the Contractor. Questions concerning this bid must be submitted in writing and directed only to: Ms. Lee A. Flaherty, Assistant Director: LFlaherty@fairfieldct.org State law requires a minimum of twenty-five percent (25%) of the state-funded portion of the contract for award to Subcontractors holding current certification from the Connecticut Department of Administrative Services ("DAS") under the provisions of CONN. GEN. STAT .4a-60g, as amended. (Twenty-five percent (25%) of the work with DAS certified Small and Minority owned businesses and twenty-five percent (25%) of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The Contractor must demonstrate good faith effort to meet the twentyfive percent (25%) set-aside goals.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2024
September 2, 2024
330 Richard White Way, Fairfield, CT
Related To This Project
Fairfield, CT
Bid Date: Aug 08 2024
Fairfield, CT
Bid Date: Aug 22 2024
Fairfield, CT
Bid Date: Sep 04 2024
Fairfield, CT
Bid Date: Sep 10 2024
Fairfield, CT
Bid Date: Oct 17 2024
Fairfield, CT
Bid Date: Oct 02 2024
Fairfield, CT
Bid Date: Sep 26 2024
Fairfield, CT
Bid Date: Jul 09 2024
Fairfield, CT
Bid Date: Jul 10 2024
Fairfield, CT
Bid Date: Jul 18 2024
Fairfield, CT
Bid Date: Jul 10 2024
Fairfield, CT
Bid Date: Jul 24 2024
Fairfield, CT
--
Fairfield, CT
Bid Date: Jun 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.