BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Missoula, Montana. Working plans call for site work for a road / highway; and for paving for a road / highway.

As per the Owner the project has been rejected. Editorial Content Team is actively seeking updated information. Question Submission Close Date 8/1/2024 2:00 PM MDT Questions have asked to Richele Parkhurst Contractor will provide all labor, materials, equipment, traffic control and incidentals necessary to remove current inlaid 3M tape pavement markings. Removal of the current pavement markings, cleaning of the roadway surface, preparation of the roadway surface and application of the new Epoxy pavement markings will be in accordance with the manufacturer's recommendations and in accordance to MUTCD. Contractor will provide all labor, materials, equipment, traffic control and incidentals necessary to apply epoxy pavement markings per contract information. Work will include 4,000 SQ FT of Crosswalk and Stop Bars, and 4100 SQ FT consisting of (86- Single Arrows), (6- Double Arrows), (95- ONLY), (3-Bicycle), (6-Bicycle Arrows). Contractor shall replace the existing stripes and symbols in kind unless otherwise directed by the Maintenance Chief. Where centerline rumble strips are present, the surface of the rumble strip will have a grind per Table 1, Section 1.0. Contract Information. The bottom portion of the rumble strip will be cleaned, dry, and free of debris prior to striping application. Contractor will not be allowed to use water blasting to clean. If current words and/or symbols have shadowing, the shadowing must be completely removed and replaced with words and or symbols that conform to current detailed drawings. Shadowing is defined as a word/ and or symbol having multiple visible letter(s) from previous applications. Removal will be by heavy grind or by a method approved in writing by the Maintenance Chief or their designee. Acceptance of any words and/or symbols that do not conform to current detailed drawings must be approved in advance, in writing by the Maintenance Chief or their designee. The Montana Department of Transportation reserves the right to sample materials at any time. CROSS WALKS AND STOP BARS (IN-LAY EPOXY) Brooks and Reserve MP 0.0,Old 93 and Reserve MP 0.117, South and Reserve MP 0.848, Mount and Reserve MP 1.350, Spurgin and Reserve MP 1.605, Third and Reserve MP 2.097, River Road and Reserve MP 2.734, South and Reserve MP 2.386, Mullan and Reserve MP 3.385, Union Pacific and Reserve MP 3.654, England and Reserve MP 4.002, Expressway and Reserve MP 4.788, I-90 and Reserve South Side MP 5.325, I-90 and Reserve North Side MP 5.380, ARROWS AND ONLY'S Brooks and Reserve MP 0.0 South and Reserve MP 0.848 Third and Reserve MP 2.097 Mullan and Reserve MP 3.385 Union Pacific and Reserve MP 3.654 Expressway and Reserve MP 4.788 I-90 and Reserve MP 5.325

Final Planning

Roads / Highways

$100,000.00

Public - State/Provincial

Paving, Site Work

3

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
5
Bidding Soon
53
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

March 14, 2025

img_map_placeholder

Multiple Locations, Missoula, MT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.