Site work for a bridge / tunnel in Venice, Florida. Completed plans call for site work for a bridge / tunnel.

Deertown Gully Headwall Replacement. Bid Bond 5 % Bid Secuity Required Project Estimated Budget $300,000.00 Scope of Work The replacement of the existing Deertown Gully headwall structure located west of Nokomis Ave S, between The Corso and Gulf Drive/Field Ave. and site restoration. The project is exempt from SWFWMD permitting per Rule 62-330.051(9), F.A.C. A City Building Permit is required. A City Site Prep Permit is required; the application fee for the Sit Prep Permit will be waived. The City reserves the right to reject any or all bids/proposals in whole or in part, with or without cause, to waive any requirements, irregularities or technical defects therein, when it is deemed to be in the interest of the City. SCOPE OF WORK A. B. C. Description The work to be done consists of the furnishing of all labor, materials and equipment, and the performance of all work included in this Contract. Further details in Section 01014. Work Included The Contractor shall furnish all labor, superintendence, materials, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies and other means of construction necessary or proper for performing and completing the work. He shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Owners Representative, and in strict accordance with the Contract Documents. The Contractor shall clean up the work and maintain it during and after construction, until accepted, and shall do all work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the work. The cost of incidental work described in these General Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials and equipment, prior approval of the Engineer notwithstanding. The Contractor shall comply with the requirements of all permits and regulatory agencies having jurisdiction over the various portions of the Work. Contractor shall provide and maintain effective erosion control measures for the entire duration that construction is in progress. Public Utilities and Structures Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, house service connections, vaults, manholes and all other appurtenances and facilities pertaining thereto whether owned or controlled by the Owner, other governmental bodies or privately owned by individuals, firms or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage, water or other public or private property whichmaybe affected by the work shall be deemed included hereunder. The Contractor shall protect all public utility installations and structures from damage during the except those specifically designated to be removed or relocated. Access across any buried public utility installation, or structure, shall be made only in such locations and by means approved by the Engineer. The Contractor shall so arrange his operations as to avoid any damage to these facilities. All required protective devices and construction shall be provided by the Contractor at his expense. All existing public utilities damaged by the Contractor which are shown on the Plans or have been located in the field by the utility shall be repaired by the Contractor, at his expense, as directed by the Owners Representative. No separate payment shall be made for such protection or repairs to public utility installations or structures. Public utility installations or structures owned or controlled by the Owner or other governmental body which are shown on the Plans to be removed, relocated, replaced or rebuilt by the Contractor shall be considered as a part of the general cost of doing the work and shall be included in the prices bid for the various contract items. No separate payment shall be made therefore. Where public utility installations or structures owned or controlled by the Owner or other governmental body are encountered during the course of the work, and are not indicated on the Plans or in the Specifications, and when, in the opinion of the Engineer, removal, relocation, replacement or rebuilding is necessary to complete the work under this Contract, such work shall be accomplished by the utility having jurisdiction, or such work may be ordered, in writing by the Engineer, for the Contractor to accomplish. If such work is accomplished by the utility having jurisdiction it will be carried out expeditiously and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement or rebuilding as required. The Contractor shall give written notice to Owner and other governmental utility departments and other owners of public utilities of the locations of his proposed construction operations, at least forty-eight hours in advance of breaking ground in any area or on any unit of the work. This can be accomplished by making the appropriate contact with the "Underground Utility Notification Center for Excavators (Sunshine State One Call of Florida)." The maintenance, repair, removal, relocation or rebuilding of public utility installations and structures, when accomplished by the Contractor as herein provided, shall be done by methods approved by the Engineer. All questions, comments, or concerns about this ITB must be submitted in writing to Kayla Case, Procurement- Finance Department, for the City of Venice, Room 204, 401 West Venice Avenue, Venice, FL 34285 or e-mail at kcase@venicefl.gov Mrs. Case is the only designated representative of the City authorized to respond to comments, questions, and concerns. Question Deadline 08/09/2024 at 1:00 PM ET BID OPENING LOCATION: City of Venice, Venice City Hall, Building Conference Room #169, 401 West Venice Ave., Venice FL 34285 LOCATION: City of Venice, Venice City Hall, Community Hall, Room #165, 401 West Venice Ave., Venice FL 34285

Bid Results

Bridges / Tunnels

$391,419.00

Public - City

Site Work

10

10

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
45
Bidding Soon
809
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

September 18, 2024

img_map_placeholder

Nokomis Ave S, Venice, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.