BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000274404 Question Acceptance Deadline 2024/07/25 02:00:00 PM EDT Bid Intent Deadline 2024/07/30 11:59:00 PM EDT 240033-280034: The study is to review and evaluate the condition as well as factors affecting the condition of the following systems: fire alarm system (panel and end devices), detection systems, emergency lighting, sprinklers, standpipes, and exit lighting. 240038-280035: The intent of this project is to perform a comprehensive investigation of the interior fire separation and fire stopping elements for all of the buildings at the MOE Laboratory site at 125 Resources Road The following requirements apply to all studies and are the responsibility of the proponent, including the Study Report Requirements in section 1.4: . Comprehensive: The study shall be comprehensive in scope and include an investigation of all applicable building system elements to address all unknowns pertinent to any recommended future work. As studies are exploratory in nature, it is the responsibility of the proponent to advise the Owner if and when it becomes apparent that investigation of additional building system elements may be warranted beyond that stated in the original scope in order to comprehensively address all unknowns of interest to the study. Accurate: To ensure study findings are fully informed and accurate without errors or omissions, the proponent shall interview key facility personnel when conducting information gathering. Key personnel are those with any or all of historical knowledge of the site; knowledge of past changes, modifications, or repairs to the building system elements of concern; and understanding of or responsibility for day-to-day operations and/or maintenance of the building system elements of concern. The proponent shall solicit input from the Project Manager, Facility Manager, and Ministry representative (if applicable) on key personnel during the study kickoff meeting. The proponent shall subsequently provide a written list of all key personnel identified, showing the name of each individual, for review and approval by the Project Manager and stakeholders. The proponent is responsible to keep a record of all interviews conducted, to be made available on request. The following activities and deliverables must be overseen by a qualified professional as identified in the proponent's submissions (see Table 7.3.1): Visual inspections Intrusive testing and specification development Study report Recommended Needs Template (RNT) Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Laboratories

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
248
Bidding Soon
4,514
All Active Projects
1,765
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 1, 2025

img_map_placeholder

Multiple Locations, Toronto, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.